Chapter 503 Equipment Installation

Yang Geyong almost cried. What a high management fee! I really hope that such management fee can be maintained for a longer period of time.

"How much do you want to change this truck?" Yang Geyong asked. He really didn't know the price of the car, so Akkelie had to decide this.

Akkelie rolled his eyes and asked, "Will you still sell these rails in the future?"

Yang Geyong nodded: "I changed your car to pull the rails, and one car is definitely not enough. I want as much as you have!"

Akkelie smiled. Such used cars are cheap for them. As long as Yang Geyong is willing to give it away, he is willing to give it to you for free. So he glanced at Yang Geyong's stall and then drew a circle with his hand:

"These things belong to me, you can take the car away. But we have to agree that you will buy the scrap iron I brought with you at the price today."

Yang Geyong stretched out his hand and shook with him: "A word is certain!"

The goods on Yang Geyong's stall cost more than one thousand yuan. He changed to a Gas truck and loaded all the other goods he had received into the car, and Yang Geyong drove away.

When they arrived at Shihezi, the two girls were very surprised to see him driving a big truck. They hurriedly asked what was going on? They were also very happy. They bought a truck for 1,000 yuan, and the fool was not happy.

However, seeing the rag on Yang Geyong's car, Zhao Ling'er asked in surprise: "Why are you pulling these things?"

Yang Geyong did not intend to tell her what she was going to do. Zhao Linger had a strong personality, and her father's status was there. He was not going to let Zhao Linger get involved in this matter. So he said a few words in a vague way. Zhao Linger didn't care about these rags.

The infrastructure company is a small company in a group, and cannot be compared with the agricultural company and the animal husbandry company. The total population of the larger agricultural company is almost a thousand. The total population of the infrastructure company is now only more than 300. This is also one of the main reasons for insufficient labor.

Ma Quanyi and Ye Wancheng have some headaches about this matter. No matter how few new factories are used, they will have to use fifty or sixty people. But if all the men from the infrastructure company are drawn into these two factories, it will be fine in winter, but after spring, the prefabricated board factory will have no labor. No one is willing to give up such a good business.

However, the winter in northern Xinjiang is relatively long, so don’t consider it first. However, the matter of moving new factories in the clothing factory was put on hold because the plastic film factory needed a large factory, so they could only give up the new factories first. Liu Sannu was very unhappy about this, but there was no good idea.

Ma Quanyi could only try his best to appease the hero of the Infrastructure Company. There is no way, now the clothing factory is supporting half of the Infrastructure Company.

What Ma Quanyi urgently needs to solve now is the factory problem of the steel plant. Although this steel plant is currently just a simple steel ingot factory, which heats and purifies the scrap steel, it cannot be operated in the open air, right?

After a few discussions, it was decided to first prepare the foundation on the river beach next to the hydropower station. Before the freezing is still available, the concrete is poured first, mainly ground beams, ring beams and columns. After these things are watered, it is easier to solve the problem of building a house or building a shed.

Ma Quanyi sent a tractor to the regiment headquarters to borrow several mixers. At that time, there were no large mixing stations, and they were all small mixers. If you operate five or six units together, you can use them completely.

The steel bars and woodworkers were all ready-made. After the grooves were opened, the vigorous construction began. In order to support the development of the infrastructure company, Liu Qinghua also sent the construction company of the regiment headquarters. This time, the speed was even faster.

Yang Geyong hired all three trucks in the regiment and began to pull waste into the company. At that time, there were no overloads, and four vehicles had 60 tons of them in one trip. When it snowed, more than 2,000 tons of waste had been piled on the river beach.

At this time, the equipment sent from Germany was also in place. Because they were not high-tech equipment, only two engineers were sent there to guide the installation.

Because there were really insufficient staff, Ma Quanyi had to transfer all the girls from the clothing factory to learn how to install and use the equipment. Of course, this refers to the plastic film factory, and the steel factory naturally had a boy. Wei Yuxiang was also drawn from the hydropower station, mainly responsible for the debugging of the steel factory.

What was unexpected this time was the equipment of this steel plant. It was very small and used for electricity. After watching it for a long time, Ma Quanyi couldn't believe that this little thing could produce twenty tons of molten steel every day.

But when he was tested, he was stunned. Scrap steel was inserted into the medium-frequency furnace along the conveyor belt, and in a blink of an eye it turned into flowing steel. After simple purification, it was poured into the ink mold. The ingots began to turn red from white, then dark red, and finally turned into blue ingots. These simple processes made the men in the infrastructure company look moist.

The debugging of the plastic film factory is more complicated. It is mainly the two blow molding machines. As the people with the highest education in the infrastructure company at present, Ma Rong and Yu Lan are responsible for learning and installing and using them with German engineers.

The engineer at the steel factory was a middle-aged man in his forties, rigid and serious. He felt very uncomfortable dealing with him. But Wei Yuxiang had never cared about his attitude at all. No matter how he roared, Wei Yuxiang always did his job in an orderly manner.

After a long time, this foreigner was finally developed by Wei Yuxiang's eagerness to learn and meticulous work. Under Luke's translation, he told Wei Yuxiang all the key points of repair and debugging of this equipment little by little.

Germans are better than Japanese, and they basically teach the equipment and technology they sell. However, when the Japanese sold equipment, they didn't teach these things very much, because they eventually made more money in after-sales and repairs than selling equipment.

The engineer at the plastic film factory is a woman and very young. The most amazing thing is that she also knows some Chinese, although the words often do not express the meaning. However, as they communicate more, they gradually become accurate.

She is very kind to people and is quite enthusiastic. The company has freed up a dormitory for her. Ma Rong and Yu Lan moved over to take care of her diet and daily life.

At the beginning, the most unacceptable thing about this foreign girl was that she had no bathroom. The public toilet in the company was just a few large wooden boards directly on the cesspool. When she first entered, she vomited for a long time after she came out.

However, humans have the strongest adaptability to biological adaptability. In particular, Ye Yuze paid ten times the salary they paid to the engineers who installed and debugged this time that was ten times that of their home country. Under the temptation of a heavy money, it doesn’t matter how difficult the environment is.
Chapter completed!
Prev Index    Favorite Next