Chapter 584: Pangu-level Space City Project 5
It is precisely because of the Phoenix 5 series aerospace planes that now Tiangong Technology only has 5. Therefore, at this time, Tiangong Technology built Pangucheng. The main carrier tool for Tiangong Technology was not the Phoenix 5 series, but the Phoenix 2 series. After all, compared with other larger aerospace planes, the Phoenix 2 series has a very high ownership capacity and is also acceptable in terms of carrying capacity. Ordinary modules are transported to the Phoenix 2 series, which is enough to be placed in larger modules, so naturally they can only use larger aerospace planes.
As for the Phoenix series, although Pangu City also played an extremely important role in the construction of the Pangu City, its main purpose is not to transport goods, but to carry people traveling between the ground and space layers.
It is also the main means of transportation between Pangu City construction site, other space stations and the moon.
Immediately, Luo Daling and others, like other staff inside the aerospace plane, put on exoskeleton space suits and prepared to officially enter the construction site of Pangu City.
Although the most core area of Qipan Ancient City has been built at the construction site of Pan'an Ancient City at this time, a giant of more than 100 meters long has actually been built compared to the design data of Pan'an Ancient City, more than 100 meters have just begun. The most important thing is that these more than 100 meters are actually being built. In addition to important cabins such as the core cabin, most of the other cabins are actually just keels.
At this time, according to Luo Daling, their preliminary estimates, there were at least 10,000 people, and these people were under construction in a tense and orderly manner.
Of course, during the construction of Pangu City, it was not only manual to rely on astronauts wearing exoskeleton armor. In addition to the use of manual labor in some places, there were actually a large number of professional space construction equipment, such as space multi-functional construction ships that were only the size of a car.
Don't look at these. The construction ship is not large in size only the size of a car, but the thrust of the plasma medium engine it is equipped with is not small. In addition, these construction ships, the two huge robotic arms in front make it easy to push a behemoth hundreds of times heavier than its own weight in space.
In addition, since these two robotic arms adopt a multi-joint structure design, they can also perform some fine work, such as screwing some larger screws.
Of course, if it is some very fine jobs, such as the arrangement of small stewards, these space construction ships are still not competent. For these fine professional equipment, Tiangong Technology is actually under development at this time, such as using some smaller robots to replace manual work.
After all, construction in space is really too dangerous. It has only been more than a month since Tiangong Technology started the Pangucheng project until now. However, in the past month, many accidents have occurred at the construction site. Fortunately, the construction workers at the construction site are all wearing professional exoskeleton space suits provided by Tiangong Technology, so no one was injured. However, this also made Tiangong Technology and Wang Bin themselves feel scared.
Therefore, in terms of management of the construction site, on the one hand, Wang Bin has also initiated the intervention of their central intelligent brain of Tiangong Technology, while on the other hand, it has allowed Tiangong Technology to speed up the development of various space professional construction instruments and equipment.
However, the space construction equipment that I want due to the hasty time cannot be developed in a short time.
However, as the construction of the space layer gradually deepens, professional construction equipment will increase. He believes that when the main keel construction of Pangucheng is completed, most of the professional construction equipment will definitely be in place.
At the same time, after interviews with Luo Daling and others, they learned that although space construction is very dangerous and hard, due to the lack of construction workers and engineers, these workers have adopted an 8-hour working system just like ground construction.
After 8 hours of construction, aerospace planes will pick them up and return to the ground, and new construction workers will also be brought to take over their work.
Some of these aerospace planes are powerful among Sky Technology, some of them are official, while others belong to other domestic aerospace companies.
Therefore, Luo Daling can clearly see at the site that during the construction period, the airplanes traveling on site continued, and a large part of the airplanes were passenger airplanes. Some of the destinations of these airplanes were Ziwei Space Station, some were lunar bases, and most of the airplanes were naturally on the earth.
Another month passed in a hurry, and at this time, the core cabin project of Pangucheng, after more than three months of construction, has roughly completed the skeleton and entered the overall core cabin. According to Wang Bin and his official estimates, at most half a year is the end of this year. By then, the core cabin project of Pangucheng will be completely completed, that is, the first phase of the project will be completely completed, and then it will enter the second phase of Pangucheng, which is the first ring project of Pangucheng's three ring projects.
Compared with the first phase project, the actual project volume of the second phase project, that is, the first ring project. Compared with the core compartment of the first phase project, the actual project volume is not much larger, so the construction time will not be much longer than before. In the subsequent third and fourth phase projects, since the ring diameter is much larger than the first ring, the project volume will also increase significantly. According to official estimates, it will take at least two to three years to complete.
However, as Tiangong Technology's Pangu-level space layer project and the overall keel of the core cabin project is about to be completed, the foreign Ark-level space city project is still in the process of designing, and even the design of engineering drawings has just begun. According to their estimates, it will take at least one or two years to complete the design of the overall engineering drawings.
Why are these foreign aerospace agencies and aerospace companies very disappointed? You should know that for their Ark Space City, the aerospace companies or aerospace agencies are located, they have gathered the top talents in their country to design this space city. However, even if the design work is like this, the progress is very slow. This is still under the reference of Pangu City with Tiangong Technology. If there is no Pangu City design drawings as a reference, then the capabilities of these aerospace agencies and aerospace companies will require at least, so that you can design qualified space city engineering drawings in 20 years.
Chapter completed!