The roads in Calabash Valley were dirt roads from the earliest days when the village was scattered. Now no one lives in it, and all the buildings have been abandoned and collapsed, and the plants have grown densely during this period.
Originally, Chen Mo thought that in a place as big as Calabash Valley, and these three people were all women, it would definitely take several days to complete the actual survey of Calabash Valley. He did not expect that professional people are professionals, and as soon as the equipment was taken out, it would take several days.
, also shocked him for a moment.
The two assistants put down the small boxes in their hands at a more conspicuous place in Hulu Valley. After opening them, they took out a four-wing aircraft. They controlled it directly with their mobile phones and flew in Hulu Valley. The other part of the mobile phone was connected to a notebook.
During the flight and detection of the aircraft, the notebook used imaging software to form the topography of the Hulu Valley, and also directly formed some data through infrared and other means.
After all the data is input into the computer, a 3D terrain module is formed directly through the software, and all the data is marked one by one. There are also some specific places where data cannot be obtained, such as water depth, etc., which can only be measured and recorded by people in person.
However, there are not many places where you can go and measure in person. The two residents are both young people who have just graduated. There is no difference in age between them and Chen Momai. They both climbed up and down happily to measure all the data.
After that, import it into your computer.
Chen Mo looked at these things curiously and could only admire them in his heart. He didn't expect that today's technology has advanced to this point. He had never heard of it. He originally thought about how these girls would stay here for a few days. What would he do?
Arrangements and the like, but from the looks of it, their inspection would only take one day.
During the period, after the computer image was formed, Xi Zhihan also worked with Chen Mo to inquire about some special places or some topography and landforms, and expressed some of his design concepts or plans.
Both wireless and infrared have distance limitations, so the four people moved several times within a few hours to complete the measurement and mapping of the entire Hulu Valley.
Since there was no signal in Hulu Valley, when Chen Mo came out, he received several calls, including those from Chen Ming, Dahai, Ding Lanhua, etc. He called them all first to say hello.
It was getting late, and he didn't have lunch himself. Seeing that it was already afternoon, he invited Xi Zhihan to his home. He originally wanted to treat them to a meal or something, but he refused.
Open your laptop directly at home and start discussing some design and other related issues, and take the road into consideration for overall planning.
Road construction must be built to the highest standards. Otherwise, trucks will damage the road later, so it is better to repair it once and benefit for life.
Hulu Valley will be built separately on the north-south slopes on both sides. Facilities such as houses will be built on the south side, and the north side will be used as a planting base. All the excavated earth and rocks will be padded to the bottom of the valley, and the bottom of the valley will be built into a road that can accommodate two lanes of traffic, a flowing water landscape, and a dam.
Buildings such as reservoirs, creating some artificial landscapes, etc.
The construction period is divided into three phases, with roads, valley bottom landscapes, dams, etc. being constructed first. In the second phase, several resort centers, accommodations, various functional houses, etc. will be built in the smaller valley in front of the Calabash Valley.
.The Hulu Valley behind the third phase of construction is a larger valley. However, since it is the innermost area and is larger than the valley in front, it must be designed as a valley integrating villas, vacations, and recuperation, and it must be isolated from the valley in front.
High grade etc.
"That's all I can think of. You can design the plan based on what I said. If there are any shortcomings, I need your professional knowledge to make up for the things I didn't mention or didn't think of."
Chen Mo talked about his thoughts and ideas, and Xi Zhihan also took a recorder to record, which gave him a sense of déjà vu being interviewed.
Xi Zhihan smiled slightly and said: "All the discussions today are not difficult in terms of architecture. The difficulty is that if we design appropriate buildings and artificial landscapes based on the actual topography and geography, and the other is reasonable
Take advantage of the terrain, etc.”
Chen Mo nodded, fully agreeing with what she said.
"I already understand your requirements and some ideas. However, there may be some new issues during the design, and I will discuss them with you at that time."
"There's no problem. You can call us anytime. But in terms of the design cycle, I hope it can be as soon as possible!"
"No problem, I will speed up the design cycle and try to complete the design within half a month."
"Does it need to reach the stage where it can be constructed?"
"certainly."
"That's good. Also, how to calculate the design fee?"
Xi Zhihan smiled like a hibiscus in full bloom and said softly: "Shen Tingting and I are friends, so I don't follow any industry rules or fee rules. This project is based on a design fee of 500,000 yuan."
"Okay, it's settled!" Chen Mo nodded knowing that the price Xi Zhihan mentioned was almost half the price. However, he also knew in his heart that he had accepted Shen Tingting's favor.
Although he didn't know what was going on, Chen Mo felt that Xi Zhihan's attitude towards him was much better, but he didn't go beyond it at all. He still treated her as a normal person discussing business. This situation lasted until the three of them left.
Seeing that it was already afternoon, I didn't have lunch, so I could only make a few noodles in the car hungry and then went to the fields.
The person introduced by Chen Ming had already arrived and was busy measuring and waiting in the field. Chen Mo went over to meet with him, paid a deposit in advance, and arranged for Chen Jingui to take the workers and cooperate with him to lay all the surrounding fences.
I also went to look at the workers' canteen, kitchen and other things. However, because some construction work in the newly built workers' courtyard was not completed, people could not live in it yet, so they set up a few tents on the edge of the field to use it to get to the canteen.
Kitchen, office, etc.
It happened that since the main structure of the worker's house was built, he had not visited it. Taking advantage of the time now, he went to look around the house. With Ding Lanhua and Chen Jingui, he made some plans for the functions of the house. In addition,
He also told them that after the house is completed in a while, they will move in on their own, and there is no need to talk to him anymore. As for the arrangements, let them discuss it themselves. If they can't solve it or have any questions, they can come and ask him.
There is also a monthly salary increase of 500 yuan for Chen Jingui as an additional subsidy for Chen Jingui’s night shift. As for the time, it will start this month, and it will not be different by a few days.
In addition, the workers’ daily food standards were explained, and Chen Jingui’s dinner for the night shift was also provided to him. Since Uncle Jin Gui was so concerned, he would not be reluctant to spend a small amount of money. Although the small money was not much, it was worth the price.
The effect achieved is overwhelming.
After the arrangements were almost made, I went to the construction site for digging fish ponds again, asked the foreman for some sterilizing drugs in the fish ponds, and then returned to my residence.
However, after I came back, I felt that the sun was quite harsh, so I lay down in a cool place and continued my unfinished work of sleeping in the morning.
What Chen Mo didn't know was that after Xi Zhihan returned to West Market, he talked with Shen Tingting on the phone and praised him a few words. There was nothing new, it was just that he was a normal person and not a pervert. For the first time, Shen Tingting's gaze felt reliable. It seemed that only her own gaze was normal. This also caused Shen Tingting and her to stumble for a long time. If they don't undermine each other, they are not good best friends. The two chatted for a long time before hanging up the phone with satisfaction.
For her, who met Chen Mo today and tested it several times, it was an easy matter. If Chen Mo didn't pass the test today, she would definitely stop him from interacting with Shen Tingting. But fortunately, Chen Mo was pretty good and basically passed the test. .