typeface
large
in
Small
Turn off the lights
Previous bookshelf directory Bookmark Next

Chapter 584: Too Much Investment

In the newly opened bamboo planting area in Xiahe Town, the main road is a spacious cement road.

The bamboos planted last year have already grown leaves at the joints. It should be because they didn't receive much fertilizer, so the growth of these bamboos is average.

I spent a period of time traveling between Hongge and Xiahe Towns to determine the bamboo forest plan for Xiahe Town.

It's July.

After experiencing the small train in Dadong Bamboo Farm, the Huacheng government once again discussed subsidy for the bamboo train in Xiahe Town.

The bamboo forest train is different from the orchard train...

The bamboo forest train must first save costs, and secondly, it must carry a large load.

If the quality of the track is poor, it will be of little use. If the quality of the track is high, the cost will be expensive...

What’s more important is full coverage…

This is very exaggerated.

Full coverage means that you can reach the track of the small train up to fifty meters away.

1 acre requires 6.6 meters of track.

Huagang Vehicle Factory has designed two sets of small train tracks suitable for use in bamboo forests, both of which are double tracks.

Two of the sets are used by Dadong Bamboo Forest.

The main rail has a standard load-bearing capacity of 20 tons, but can actually bear more than 30 tons, and costs 1,100 yuan per meter.

The auxiliary rail has a standard load-bearing capacity of 3 tons, but can actually weigh about 5 tons, and costs 510 yuan per meter.

Option II.

The main rail, with a standard weight of 10 tons, is actually about 15 tons and costs 710 yuan per meter.

The auxiliary rail has a standard load-bearing capacity of 2 tons, but the actual load is about 4 tons, and the cost per meter is 380 yuan.

Previously, Huacheng had a subsidy program for orchard trains, with a subsidy of 138 yuan per meter. Monorail trains for mountainous areas, carrying several hundred kilograms, cost 156 yuan per meter.

However, small trains are used in bamboo forests, and the load-bearing capacity is small and useless.

Bamboo Forest needs main track and secondary track...

The bamboo forests contracted by Xiahe Town are at least a thousand acres. The larger ones are tens of thousands of acres per bamboo forest.

If you want full coverage, you need at least 10,000 acres of bamboo forest per acre... about 55-75 kilometers of track and at least 30 million yuan.

The entire Xiahe Town plans to plant 1.25 million acres of new bamboo forests.

According to the minimum standard, the total investment is 3.75 billion.

In the past few years, Huacheng has been undergoing extensive construction, and too much money has been spent. For the time being, there is no way to provide huge subsidies. For an area of ​​more than one million acres, even if the subsidy is 138 yuan per meter, it cannot be achieved... not that much

money.

Let’s put the little train thing on hold for now.

Hongshan Shares began to withdraw funds.

More than 2,000 tons of organic fertilizer are delivered every day, earning more than 1 million yuan in revenue.

By the end of the month, the company had some money in its account and purchased another tank truck.

For a new energy tank truck, the electricity bill for a trip to Xiahe Town and back is more than 70 yuan, plus salary... One truck costs five to six hundred yuan a day.

"It's not cost-effective to transport waste water to Xiahe Town for free." Zheng Jinyuan finally came back and said after knowing the cost of transporting waste water.

"In order to make the bamboo forest grow better, this money must be spent." Ye Mo said.

Li Xuebin shrugged, looked at this month's income, and the organic fertilizer stored in the warehouse, and said: "In this way, the profit of organic fertilizer will be even less."

"It's a drop in the bucket." Ye Mo said, "As long as the bamboo supply is stable, there will be no loss."

"Why did you offer to transport it for free? If it were me, I would charge at least one hundred yuan for a ton of manure..."

"Twenty tons of dung per car. As far as the bamboo we collect is concerned, this little bit is not much. Just think of it as benefiting one party." Ye Mo looked at Li Xuebin and the two of them.

The two smiled and nodded: "No problem, I'll give it to you for free..."

The dung water sent there will be supplied to Dadong Bamboo Forest first, and then to Uncle Ye Mo and his friends.

There are only two breeding companies here in Hongshan, and septic tanks have been built, but the output is a bit low.



As July enters, more and more orchards are in need of fertilizer.

The entire company became busy, transporting truck after truck of organic fertilizers, and by August all the organic fertilizers had been delivered.

In addition, there are still some orders on hand that have not yet been produced.

Zheng Xia calculated Lilan from January to July.

From January to now, a total of 447,500 tons of organic fertilizers have been sold.

Profit after deducting costs was 385 million yuan.

These profits include government subsidies.

The subsidy alone is 179 million.

I used to think that making organic fertilizers was very profitable, but after actually doing it, I realized that this business is not simple.

There are many workers and raw materials...

The most troublesome thing is that organic materials cannot be purchased nearby.

The cost of transporting organic materials back from more than a thousand kilometers away is high.

"Aren't you satisfied with this Li Lan?" Li Xuebin looked at Ye Mo and said with a smile.

"They said they made a profit of 385 million. But there are only 250 million in the account now..." Ye Mo said: "I have to pay back 100 million to the bank soon, so there is only 150 million left."

"All the money has been invested." Zheng Jinyuan said: "Although there is not much money in the company's account, as long as the company's operations are listed, our company's market value will be conservatively over 3 billion."

"Isn't it that exaggerated?"

"This is conservative... In the first round of financing, the valuation of Hongshan shares will not be less than 1 billion. In the second round of financing, it may reach 2 billion." Zheng Jinyuan said with a smile: "It's a pity that we are not a technology company.

.If it is from a technology company, the annual profit is several hundred million...the market value can reach 5 billion."

"Would you like to raise money and go public for fun?" Ye Mo said.

He doesn't really want to manage the company now because he has too many things to do.

Over in Gaoshanping, Ye Mo can earn more than 100 million a year. Just this year, including selling coconut seedlings... he has earned more than 200 million.

But it feels like no matter how much money you make, you still don’t have much money in your pocket...

Ye Mo is like this.

This is especially true for Hongshan Shares. I feel that no matter how much money I make, it is not enough.

Hongshan Co., Ltd. is also planning to build a resort and water park... to be built in Wutiaogou. This part will conservatively require an investment of several hundred million.

Of course, it can be built with a cost of tens of millions. But if the cost is too low, the experience will not be as compelling as it should be.

"Can't your coconut seedlings be transplanted yet?" Zheng Jinyuan said.

"It's coming soon. It will be delivered at the end of this month." Ye Mo said.

"We will wait for your coconut seedlings until the flowers have withered." Li Xuebin threw a cigarette to Ye Mo and Zheng Jinyuan and said, "How long will it take for the durian seedlings to be delivered?"

"The first batch will be delivered in September. Don't rush these things..." Ye Mo said, lighting up his cigarette and getting ready to go back.

Zheng Jinyuan stopped him and said, "Go to Gaoshanping and have a look."

"Let's go."

Went downstairs together, Li Xuebin and the others got into Ye Mo's car and came to Gaoshanping.

Ye Mo hasn't come back for more than ten days. Before that, he had been running to Xiahe Town...

The coconut trees in Gaoshanping have grown taller again, and the leaves on the top are particularly large. The coconut trees are blooming at this time, and the clusters of flowers look particularly numerous.

There are still some unpicked coconuts hanging on the trees, which look a bit tempting.

Dwarf coconut trees and super dwarf coconut trees do not grow taller, their trunks are much thicker, and their leaves grow very beautifully. They bloom more flowers.

Ye Mo has an organic fertilizer factory and his own orchard at home, and he is willing to use fertilizer.

This year, 1 ton of organic fertilizer was used for each acre of coconut grove. Bamboo charcoal organic fertilizer and No. 1 fertilizer were mixed together. There are grasses growing under the coconut grove, and they are growing particularly vigorously.

Every time he saw these vigorously growing grasses, Ye Mo felt that they had eaten too much fertilizer, and thought about hoeing them. He thought about it several times, but in the end he couldn't bear to part with it. There are grasses and the ecological environment of the mountain flat.

Just very beautiful.

At night now, I heard them say that there are fireflies everywhere. Some workers posted photos of fireflies taken at night on Douyin, which received hundreds of thousands of likes and people asked for their address.


This chapter has been completed!
Previous Bookshelf directory Bookmark Next