Chapter 429: Supporting Engineering Group in Yunshan District
It was getting dark when we got back to the ranch.
Cohen and Moxi prepared a reception banquet for Kang Si, and also invited Luo Zhi and Chen Mo's uncles to join them...
Kang Si is not only highly educated, but also a technical talent and a co-ordinator. It was Kang Si who presided over the design and supervised the construction of the sewage treatment center of Valley Ranch. The sewage treatment center built by Valley Ranch in St. Beni was also built by Kang Si.
Host the design...
He was called here to participate in the construction and design of the feed mill and the Yunshan sewage treatment center. He had been in the United States before, but he was also involved in the early design work.
The Jie Feng Banquet is a barbecue party.
While eating barbecue and drinking beer, Chen Mo and Kang Si chatted about the feed factory: "The feed factory will be built according to the construction period, and the drying tower will be built first. The grass sown now should be harvested for the first time in two months.
The drying tower should be built as quickly as possible, but the quality must be guaranteed."
"Boss, the current construction pressure is too great. Some of the breeding buildings of Hehe Valley Animal Husbandry and Rich Farmers Company will be built by assembly...Bright told me that they will build 10 breeding buildings within one month. It is expected that
In July, breeding pigs and breeding sheep will move into the breeding building. 10 buildings will be built in one month, all 6-story high-rise buildings. Can the construction quality and safety be guaranteed at such a fast speed?" Kang Si looked confused.
Over in the United States, it takes two to three months to build a residential building.
"Don't worry. It's just a 6-story breeding building..." Chen Mo shrugged: "One month is already a very slow time. There is definitely no problem with the quality."
Cohen handed Cons a bottle of beer: "The title of infrastructure madman is not in vain. It's just the construction part, there are no technical difficulties. If you work here for a while, you should be used to the efficiency here..."
In China, as long as enough money is given, few workers are afraid of hardship. The construction of the warehouse area of Yunshan Ranch and the opening of plantations are all progressing very quickly.
"Cohen, the work of Yunshan Feed and Yunshan Waste Treatment Center is very important to me. The design plan must be perfect, even if it costs more...especially the waste treatment center, you have to start working tomorrow.
, first get familiar with the work here, and then get into work..."
Early the next morning, Ellie took Catherine, Britney and Mia out to play. Chen Mo rode an off-road motorcycle and drove Consi around, first going to the Rich Farmers Company, where the land was being leveled.
Kang Si gets to know Bai Xiaoou and Luo Chen. Then go to the site selection of the feed factory. The land is being leveled here...
The land at the sewage treatment center is also being leveled.
There are construction sites everywhere, with green leather houses for simple temporary residences everywhere, and roadbed projects are being leveled in sections... Some sections of the road have been paved with asphalt.
In the entire Yunshan District, more than a thousand construction workers have now moved in. When the main road construction is completed, it is estimated that nearly 10,000 construction workers will enter Yunshan District and start the infrastructure construction madness mode.
In the office area of Yunshan Sewage Treatment Center, there is a group of temporarily built green houses. Nestlé Group, River Valley Animal Husbandry, Yunshan Ranch, as well as the municipal government and environmental supervision team personnel dispatched by the central government are all represented.
Over here.
A 7 billion investment project is no small project. More importantly, the 7 billion project is just the construction of supporting facilities in Yunshan District...
The first thing to build in this sewage treatment center is a biogas pool group, and four biogas pool groups will be built.
The four biogas pool groups have a total investment of 5 billion yuan, and each biogas pool group covers an area of 2,300 acres. Each of the biogas pools in the biogas pool group covers an area of about 10 acres.
The overall process includes: anaerobic reactor, sludge dehydration, biogas purification, desulfurization and dehumidification, biogas emergency emission, carbon emission reduction monitoring, software automatic control system, etc.
A biogas digester group is a main body, and it can process millions of tons of sewage or hundreds of thousands of sewage every day. Note that every day...
If the four biogas digester groups can be operated at full capacity, the biogas produced can meet the annual natural gas consumption and annual electricity consumption of the largest city in the South Island, and there is still a balance. According to the current breeding scale, this sewage treatment center alone can
At the very least, it is estimated that an output value of 3 billion can be created a year. This is the most conservative estimate...the profit is 2 billion. After all, excrement costs nothing...
The government is promoting a green South Island and will reduce the use of chemical fertilizers. In some areas, the use of chemical fertilizers is completely prohibited. There are still many places in the South Island that need to improve the soil, and there is a huge demand for organic fertilizers. Coconut State City has already treated Yunshan sewage
The center signed a purchase contract for 5 million tons of granular organic fertilizer, with the price per ton being 550 yuan.
Granular organic fertilizer is not expensive at all at 550 yuan per ton. The market price of granular organic fertilizer is basically 800 yuan per ton.
In addition to purchasing granular organic fertilizer, there is also natural mineral organic fertilizer, which costs 1,350 yuan per ton. Coconut State purchased 1 million tons at a time to improve saline-alkali land.
Chen Mo's Yunshan Ranch also purchases all fertilizers from here. The price is slightly lower, and a huge contract has been signed... Powder organic fertilizer, 280 yuan per ton. Liquid organic fertilizer, 50 yuan per ton. Natural mineral organic fertilizer.
, 850 yuan per ton. Chen Mo can get these fertilizers at a lower price because Chen Mo provides a large amount of cheap pasture feed... Yunshan Ranch will also promote the concentration of sewage.
Dirty manure is not valuable, but if it is in large quantities and processed systematically, it becomes valuable.
Yunshan Sewage Treatment Center is now a fragrant steamed bun. The tbl alliance wanted to take a stake, but they didn't let it go. Previously, the Nestlé Group wanted to take 40% of the shares. Secretary Ye negotiated with the other party several times and also reduced the share ratio.
Continue... The current investment shareholding ratio is that Yunshan Ranch holds 30% of the shares, Nestlé Group holds 25% of the shares, the municipal government holds 25% of the shares, and River Valley Animal Husbandry holds 100%.
Twenty shares.
From now on, the operation of the sewage treatment center will be handled by Hehehe Animal Husbandry, and the major shareholders will only have the power of supervision...
And the 20% of the shares held by Hehehe Animal Husbandry are not all exclusive to him. The operation of such a large processing center is not only difficult in construction, but also in operation. Hehehe Hehe Animal Husbandry gave up the invitation to give up 5% of the shares.
Joined the Dutch company onec... Bright returned to the United States a few days ago and is acquiring several large ranch manure cleaning companies with relevant experience and technology.
The Nestlé Group holds 25% of the shares and is also providing technical support for this project. The profitability of this project is nothing to the Nestlé Group, but it can obtain a lot of technology from it.
The municipal government also invited the Academy of Agricultural Sciences, and many experts and professors participated.
What Chen Mo provides is feed, not waste manure. Because they sell cheap feed, the farm has to sign a contract with Chen Mo for centralized treatment of waste manure... He also has technical talents here, Kang Si.
There are many talents who understand large-scale sewage treatment, but not many people know how to comprehensively develop it. Kangsi has already presided over the design and construction of two such projects, and served as the deputy director of Yunshan sewage treatment center after coming here.
Chief Engineer...
Chen Mo invested solely in the Yunshan Feed Factory. The first thing to build was the drying tower group, and then the green storage feed fermentation workshop. In order to facilitate transportation, the fermentation tank for green storage feed fermentation was directly converted to a carriage design. From now on, it will be
It is directly shipped to the breeding farm together with the carriage. The initial investment is huge, but it is convenient and trouble-free in the later stage.
Also, because Yunshan Ranch gained over 300,000 acres of land, the feed factory was expanded again, further increasing the budget.