Chapter 465: The Old Canal Project Scheduling Meeting (seeking the month)
The lift of the vertical centrifugal pump cannot be reached. Instead of finally wrangling and adding a level of water lifting, it is better to propose it now.
Make changes in the direction you want.
There is a problem here, which was also pointed out just now, that is, in the project list quotation, not all sub-projects are profitable.
For example, water pumping stations are basically losing money.
The reason why the water pumping station loses money is not because the price is inappropriate, but because the amount of the project is small. Although the sparrow is small and has all the internal organs, although the water pumping station is only 12 or 3 square meters, it is just like building a house, it requires a lot of work.
As a result, every process was slow and some recyclable materials, such as templates, could not be recycled.
In addition, the water pumping house is built on a mountain, and transportation of building materials is a problem.
As a result, the water pumping station lost money.
No one mentioned this aspect, Yu Qingyang just clicked on it, and then mainly emphasized quality.
Just tell Wan Guoxiang and Huang Debin clearly that it doesn't matter if you want to pursue profits, but you can't sacrifice quality.
After the meeting in the conference room, Yu Qingyang went around the construction site again.
The road is not very easy to walk. Just use an excavator to simply clear out a dirt road and put some gravel on it, which is barely enough to ensure the passage of trucks transporting steel pipes.
Yu Qingyang didn't say anything about this. This is a characteristic of water conservancy projects.
The project department cannot afford to harden the construction road along the pipeline. The measure fee is 10,000 yuan per kilometer for the construction road, which is only enough to build such a road.
There are many places on the mountain where it is impossible to build roads at all, so the steel pipes can only be lifted up the mountain bit by bit manually.
The pipes connecting the water system are laid and welded from the end.
Walking along the gravel road, more than two kilometers of pipeline welding has been completed.
“We still need to find ways to speed up the progress! It’s mid-April now, and with two more children, it will be the rainy season!
You are laying along the Laoyu Valley now. Once it rains heavily, we may not be able to work in this Laoyu Valley for a few days!"
“We are now urging the owners to speed up the relocation work!
Then work on both ends and rush to the middle!" Wan Guoxiang hurriedly explained.
"Yes!" Yu Qingyang nodded, "By the way, when did you submit the report on purchasing the micro tunnel machine?"
"I just handed it over to Mr. Chen yesterday. I should report it to the Finance Department today!"
"Well, I'll ask later, hurry up and give you the approval, hurry up and buy machinery, and the connecting tunnel can be constructed at the same time!" Yu Qingyang smiled and nodded.
In the conference room just now, he was a little confused, why he didn't see the report on the purchase of micro tunnel machine submitted by the project department.
It looks like the finance department is reviewing it.
The financial department of Huayu Investment has a very complete management system.
Every month, each subsidiary, each department, and each project department must submit a fund use plan.
That is to say, how much money you will use next month and where you will use it must be reported one month in advance to ensure pre-review.
Of course, in order to deal with some emergencies, every subsidiary CEO, department head, and project manager has a reserve fund in hand. This money should be used first and then reviewed.
Another situation is a report on the purchase of a micro-tunnel machine, such as a water system connection project.
This is a temporary purchase, and the approval is more stringent. Not only the CEO of the subsidiary company must sign, but also the head of the audit department, the financial director, and finally Yu Qingyang must sign.
For temporary purchases, the probability of rejection exceeds 80%.
Yu Qingyang asked, because he was afraid that Wan Guoxiang and the others would be stupidly waiting for the group to approve the funds to purchase machinery, but they did not know that their report had been rejected at some point.
"Xiao Duan, please go back and ask the Finance Department about this matter and see if you have received a report!"
"Thank you, Mr. Yu!" Wan Guoxiang thanked him hurriedly.
He knew that if Yu Qingyang's assistant asked, there would definitely be no problem with their purchasing report.
"Okay, that's it for today! Overall it's good, but more work needs to be done on warehouse management and pipe stacking!
The storage of consumables such as welding rods is a bit messy and they are piled directly on the ground.
Also, the steel pipes are stacked a bit high, which poses a safety hazard!
The project assessment is about to begin, and that foreigner Zhang Fusheng is not as easy to talk to as me!
Other places are pretty good, but if points are deducted from warehouse management, you, Mr. Chen, are not just scolding people!
This assessment is directly related to the allocation of the next project!" Yu Qingyang pointed out the problems existing in the water system connection project department with a smile.
"Yes, Mr. Yu is right to criticize, we will correct it immediately!" Wan Guoxiang quickly admitted his mistake.
He didn't dare to ask Yu Qingyang to stay for dinner. Yu Qingyang shook hands with Mayor Zhang and said goodbye, declining his offer to stay.
Then we visited several construction sites around the spring.
Although it is just a quick glance, Yu Qingyang, a veteran engineer at each construction site, can point out the problems they have, and every problem can be explained to the point, rather than the kind of "you need to strengthen management, strengthen quality management, safety
Education" and other clichés and empty words.
Let every project department be convinced.
Even Wu Yunfang, who followed Yu Qingyang during the inspection, was convinced and couldn't help but sigh that success is never a fluke.
At every construction site, a group of project managers in their forties can be convinced from both a technical and management level.
This is not something ordinary people can do.
In the evening, Yu Qingyang continued to pick up Xia Xue from get off work, then returned to the hotel and watched a movie.
…………
The next day, Yu Qingyang signed the purchasing report that Xue Qin brought over before leading the team to leave Quanshui.
Depart for Jeju.
The spring water reaches Jeju, and the expressway has reached Kongfu.
The road from Kongfu to Jeju is not easy to walk on the expressway, and there are a lot of big cars.
It wasn't until we arrived in Yanzhou that the road conditions got better.
The scenery outside the car window receded quickly, and Yu Qingyang sat in the back seat, closing his eyes to relax.
Yesterday I was a little overworked, because I knew that Yu Qingyang was going to Jeju, then Mudan City, and the capital, and would not be able to see each other for several days, and he was going to Ajigeria at the end of the month, so Xia Xue acted a little crazy.
Facts have once again proved that there are only exhausted cows and no damaged land.
The car stopped steadily in front of the Canal Hotel.
The Jeju Municipal Party Committee and Municipal Government have prepared a sumptuous lunch and are waiting for Yu Qingyang.
Because we had to work in the afternoon, we didn’t drink much. We only had two bottles of Maotai, and everyone got one glass.
In the afternoon, a scheduling meeting for the old canal project was held in the city government conference room.
It is still the architectural design institute that reports the municipal pipe network renovation design plan first.
This time, I was finally generous. Not only did I calculate the maximum rainstorm intensity, but I also chose a much more conservative pipe diameter.
The supervisory network directly selected 2400 tertiary pipes.
Concrete pipes are divided into two types: plain concrete pipes and reinforced concrete pipes.
Reinforced concrete pipes are divided into primary pipes, secondary pipes, and tertiary pipes based on wall thickness, crack load, damage load, and internal water pressure.
Among them, the first-level pipe has the thinnest wall thickness and is the worst pressure-bearing. The third-level pipe has the thickest wall thickness and is the best pressure-bearing.
Grades 1, 2 and 3 reinforced concrete pipes can be used for pipe jacking construction. When choosing which grade of pipes to use, the main consideration is the external pressure bearing, that is, the depth of covering soil.
The minimum covering depth of the top of the pipe jacking pipe shall not be less than 1.5 times the outer diameter of the pipe jacking pipe.
For pipe jacking with an inner diameter of 2400, you need to choose grade three high-quality reinforced concrete.
"Mr. Yu, what do you think of the Architectural Design Institute's design plan?" Zhang Hua asked after the Architectural Design Institute finished its report.
The main decision-maker in this scheduling meeting is Yu Qingyang.
After all, they are not proficient in engineering.
"I don't have any objections, except for one thing, which is the interface of the concrete pipe. I suggest changing it to an F-shaped steel socket!
When jacking pipes over long distances, the most common problems are joint misalignment, pipe end damage, pipe joint leakage, pipe wall cracks, pipe wall leakage, etc.
Compared with the tongue and groove, the F-shaped steel socket can effectively protect the pipe end, has a large stress area, and has good anti-seepage effect at the interface. It is suitable for long-distance pipe jacking, and the applicability of curved pipe jacking is better than that of the tongue and groove." Yu Qingyang is also not polite.
, directly pointed out the problems existing in the architectural design institute's plan.
"Haha, Mr. Yu is indeed an expert. We have seen the Architectural Design Institute's plan before and found no problems.
Unexpectedly, Mr. Yu saw it right away!" Zhang Hua smiled and excused the somewhat embarrassed architect from the architectural design institute.
“I can’t speak to experts. When I decided to use pipe jacking construction, I looked for information and researched it.
I am learning now and selling it now!" Yu Qingyang said modestly.
"If there are no other problems in the renovation of the municipal pipe network, then let the architectural design institute start to deepen the design! Come up with the construction drawings in the shortest possible time!" Zhang Hua made a final decision when he saw that Yu Qingyang had no other opinions.