"The largest bridge project we have ever undertaken is the Yongning-Yongjiang Bridge, with a total investment of 60 million.

The bridge structure is an SRC center-bearing reinforced concrete arch bridge with a main span of 312 meters and a bridge width of 12.4 meters, making it the largest bridge of its kind.

Won the second prize of the National Science and Technology Progress Award!" Although I don't know the purpose of Yu Qingyang's question, it does not prevent Mr. Liang from bragging about his company's performance.

"Not bad!" Yu Qingyang nodded and did not continue the topic. He picked up the wine glass and touched it with Mr. Liang.

Yu Qingyang's performance made Mr. Liang a little confused, and it was difficult to ask what the question meant just now.

After the opening banquet, Yu Qingyang returned to the company.

It is said that he serves as the project manager for the tourist road project, but in fact it is more of a name only.

Nowadays, Huayu's investment and development scale is getting bigger and bigger. There are a lot of documents that he needs to sign every day. How can he have so much energy to focus on the construction site?

It's more of an attitude.

The Comparative Tourist Road is the first first-class highway invested by Huayu Investment Group Company.

It is the first investment in the field of road and bridge infrastructure construction, and Yu Qingyang shows his importance in this way.

For this reason, Yu Qingyang specially transferred Wang Yiming, the chief engineer of Huayu Second Construction, to the project management company as the chief engineer.

And the general contracting was handed over to the strongest Huayu Second Construction Company.

During the noon start-up banquet, Yu Qingyang didn’t drink much.

I drank two glasses of wine in total.

This is the privilege of improving status at the wine table.

As a leader, you have the privilege not to drink, but to drink less.

Except for the first glass of wine at the beginning, Yu Qingyang drank it all with everyone. The second glass of wine, Yu Qingyang didn't finish until the end.

Duan Gang followed Yu Qingyang into the office, helped him make tea, and then handed him the documents that needed to be signed.

"Mr. Yu, this is the funding application reported by Huayu Real Estate!"

"Yeah!" Yu Qingyang nodded.

Huayu Real Estate is not short of money now, but it does not mean that Huayu Real Estate and Xing Xiang can spend the money as they please.

You know, when he first established the subsidiaries, Yu Qingyang castrated all the subsidiaries.

The most important personnel and finance have been castrated.

Although the following subsidiaries are independent legal persons and have independent accounts, all accounts are under the control of the group company.

All incoming and outgoing accounts go through the Finance Department of Huayu Investment Group.

Large capital expenditures, such as acquiring land and disbursing project funds, all require Yu Qingyang's signature.

Yu Qingyang opened the funding application and took a look.

Xing Xiang moved quickly and has completed the registration of branches in more than a dozen second-tier cities such as Jinmen, Ludao, Jinling, Lin'an, Suzhou, Rongcheng, Qindao, Zhujiang, Yongcheng, and Wenzhou.

And signed a letter of intent with the local government to develop the Huayu Century City CBD project.

Nowadays, these second-tier cities and the new first-tier cities in the future are under development, and it is relatively simple to obtain land.

Especially large-scale CBD projects like this are more popular with local governments.

The land parcels in each city are not small, with land areas exceeding five million square meters.

And there is no need to put up a bid at all, it can be done directly in the form of agreement transfer.

Note: The "Regulations on the Transfer of State-owned Land Use Rights by Bidding, Auction and Listing" were only implemented in 2002.

Therefore, it is not illegal at all to acquire land through agreement transfer.

Except for first-tier cities such as Beijing, which require listing for auction due to fierce competition, other second-tier and third-tier cities do not need it at all.

Xing Xiang acted quickly and spent money quickly. The 35 billion plus the previous 4.5 billion amounted to close to 40 billion. It was all spent in a flash.

Of course, although branches in more than a dozen second-tier cities have been registered and have office locations, they are basically empty shells.

Only a few administrative clerks were there to support it.

Within two years, it will basically not be developed.

At present, Huayu Real Estate's main focus is still on the development of four first-tier cities.

Yu Qingyang read it over and signed it.

Give it to Duan Gang.

"This is the funding plan reported by the Finance Department..."

"This is the performance assessment of each unit and each project department's construction site reported by the Audit and Supervision Department last month..."

"This is the summer recruitment work report from the Ministry of Personnel..."

Yu Qingyang followed Duan Gang's prompts, browsed through them in general, and then signed his opinions on them one by one.

Seeing the summer recruitment work report from the Human Resources Department, Yu Qingyang took a second look.

The recruitment situation this summer is pretty good, with more than 150 newly recruited undergraduate graduates, more than 300 junior college graduates, and 67 technical technical school graduates.

This academic structure makes Yu Qingyang quite satisfied. The new graduates who have joined the company have not yet been assigned to various departments and are undergoing pre-job training.

"Please inform the human resources department that after the pre-job training, all new graduates who join the company will go to the construction site and work on the front line for three months."

“What about graduates from technical technical schools?”

"We should still follow the original regulations. After the training, we will first sign a contract with Huayu Labor Service Company and then send Ajigeria!

After working in Ajigeria for three years, return to the company and sign a formal labor contract!"

"Yes! I will notify the personnel department right away!" Duan Gang took the order and went out to issue the notice.

As time goes by, Yu Qingyang becomes less and less worried that some people will leave because they can't stand the hardships at the construction site.

Graduates who can't stand loneliness or the hardships on the construction site, no matter how highly educated they are, are not suitable for Hua Yu's investment.

Yu Qingyang planned to use this trick to make waves and screen the new graduates again.

This is also a routine commonly used by large engineering construction companies in later generations.

Regardless of whether you are an administrative or technical graduate, when you come to the company, first go to the construction site to experience life.

In later generations, many central enterprises recruited very loose conditions, as long as they had graduates equivalent to a full-time college degree.

However, joining a company does not mean signing a contract with the company, but signing a contract with a labor service company and then being assigned to work in a certain project department.

Only if you persevere and get approval from the project department leader can you become a full-time employee and sign a labor contract with the company.

It's a pity that most people can't persist.

Of course, graduates are not entirely to blame. Policies that were good in the first place slowly changed in the following companies.

Many fresh graduates leave their jobs not because they can't endure hardship or loneliness, but because they can't see hope.



After the meeting, the union will begin.

Then comes the handover meeting and drawing review.

During this process, Nanjiang Road and Bridge began to build the temporary facilities of the project department in accordance with the standards of the bidding documents.

Before the Nanjiang Road and Bridge project was completed, construction teams began to enter the site one after another.

The first ones to enter were naturally the pile foundation team.

Under Nishui Bridge is a huge ravine, which is a ravine created by flash floods over a long period of time.

This valley is connected to the Nishui Reservoir and is one of the main water sources of the Nishui Reservoir.

During the rainy season, spring water and torrents from the mountains flow into the Nishui Reservoir along this valley.

October coincides with the dry season, most mountain springs are no longer flowing, and the flow in the valleys has also stopped.

It happens to be the best season for construction.

Yu Qingyang heard that the pile foundation team had entered the site and went to the site to take a look.

The pile driver used in the pile foundation of Nanjiang Road Bridge is a reverse circulation drilling rig.

A very heavy drill.

However, due to the geological conditions of the mud-water bridge, there is bedrock below. It is more efficient to use a reverse circulation drilling rig to make bored piles on the bedrock.

"The equipment came in very quickly?" Yu Qingyang asked with a smile.

"Enter the site in advance, inspect the machinery first, and be ready to start work!" Mr. Liang replied with a smile.

"Well, that's right. You should prepare it in advance! Is your steel bar processing plant ready?"

"I just finished laying the concrete yesterday! I'm going to work tomorrow to build the steel shed!"

"Well! Have you submitted the steel bar plan?"

"It has been submitted to the materials department!" Wang Yuepeng, project manager of Huayu Second Construction, replied.

"When can we arrive at the site? Mr. Liang's drilling rig has already arrived. We can't delay work because of the steel bars!" Yu Qingyang reminded with a smile.

For Nanjiang Road and Bridge, steel bars and concrete are all supplied materials.

"We can be there within a week! It won't delay Mr. Liang's use!" Wang Yuepeng responded.

"Well! Mr. Liang, do you still have any difficulties here?" Yu Qingyang asked again.

"Mr. Yu, someone came to me yesterday and wanted to take over a job..." Mr. Liang hesitated and said.

"Mr. Wang, do you know about this?"

"Mr. Yu, from the Nishuiquan Village Committee, I talked to them!

We don't let them interfere with the bridge. If you want to work, give them some on the way back!" Wang Yuepeng explained quickly.

"Well, according to our rules, if he wants to work in machinery, let him find a mechanical service company to sign a contract; if he wants to work in labor, let him find a labor service company to sign a contract!

Mr. Liang, you don’t need to pay attention to them!

If someone gives you trouble, you go to Mr. Wang or call me directly!" Yu Qingyang said forcefully.

Yu Qingyang was completely confident in saying this.

The tourist road is not far from Huayu Century City, just one street away. None of the gangsters nearby dare to trouble Huayu Investment.

Yes, it has been tidied up a long time ago.

"Okay, thank you, Mr. Yu! We are relieved with your words!" Mr. Liang smiled from the bottom of his heart.

What people who work on projects fear most is that local relations are not well managed and someone makes trouble.

It is a good thing for them to encounter a strong Party A now.

"Oh, that's right! You have your own team for steel work and carpentry!

If not, you can ask our labor service company for someone!"

"Mr. Yu, do you still have a labor service company?" Mr. Liang's heart skipped a beat.

I wonder if I have encountered a black project, right?

The so-called black project does not mean that there is any problem with the project.

Instead, the nails are square or the center is black.

When I signed the contract, everything was good, everyone was easy to talk to and very kind.

But after signing the contract, things changed.

The steel bars and concrete are all provided by the contractor. There is nothing to say about this, it has already been stated in the contract.

The key is that the construction machinery, excavators, forklifts, etc. that you need on site are also enthusiastically provided.

Then the workers will enthusiastically prepare it for you.

It sounds good, everything is ready, the company just needs to come over and manage it.

In fact, this is not the case. The construction machinery and workers provided by Party A are monopolistic, and the price is 20 to 30% higher than outside.

In the meantime, I will use the excuse of catching up on progress and find someone to attack you.

The salary is horribly high.

In the end, I'm afraid they are working for nothing and can't even earn a management salary.

As for filing a lawsuit or making a fuss?

It's no use at all. They are unfamiliar with the place, where can they go to cause trouble?

If you go to court, you won't have any evidence unless you can't afford it.

The various contracts signed by you are clear and clear, and you can't win a lawsuit.

Now this project is very consistent with the characteristics of a black-hearted project.

"Haha...ha!" Seeing Mr. Liang's unhappy face, Yu Qingyang knew what he was thinking and patted Mr. Liang on the shoulder, "Mr. Liang, you don't have to worry that we are a shady company!

The purpose of our labor service company's existence is only to safeguard the interests of migrant workers!

I'll ask the labor manager of the general contractor to find you later, and we'll find out after you talk!

It’s definitely more suitable than bringing people over from southern Xinjiang!

Although steel workers and carpenters work on bridges every day, they are all good at construction sites!

All of them have been professionally trained and can basically be mastered once taught!

In addition, even if it’s a part-time job, it’s much cheaper than what you can find in the labor market!”

"Haha! No, I didn't misunderstand! It's just that our labor subcontracting team has a team that has been cooperating with us for many years!

Of course, if it's really like what Mr. Yu said, it would be better!" Mr. Liang said with a sneer.

Mr. Liang had already made up his mind. If he really wanted to do what he wanted, he would just leave.

I would rather break the contract than do this shady project.

"It's your freedom to choose!" Yu Qingyang didn't say anything more.

The reason why he offered Nanjiang Road and Bridge to use workers from his own labor service company was also for a purpose.

It's not to deceive Nanjiang Road and Bridge, Yu Qingyang is not that bad.

It was also to steal the company. As I said before, the reason why the bridge was subcontracted was because the company under me had no experience in working on large-scale bridges.

No matter the technicians or construction managers have no experience, neither do the workers.

Since we are stealing from others, we naturally have to steal from others in all aspects.

From technicians to construction workers to professional and technical workers, they all want to steal from others.

After finishing the bridge on the tourist road, I will practice my skills on a few bridges, both large and small, to accumulate experience. Next time I encounter a project like the Yellow River Bridge, I will not be afraid to take it on.

After Yu Qingyang left the construction site, the labor manager of the tourist road project quickly approached Mr. Liang.

"Hello, Mr. Liang, I am the representative of Huayu Labor Service Company in the tourist road project. My name is Chen Shulu!"

"Hello, Mr. Chen!" Mr. Liang shook hands with Chen Shulu politely.

"Mr. Yu mentioned our labor service company to you before, right?

This is the price list of our labor service company!

There are contract prices and odd-job prices on it, Mr. Liang will take a look at it first!" Chen Shulu did not talk to Mr. Liang about anything else, and directly handed him the labor price list of the labor service company.

Mr. Liang took the price list with the intention of checking the situation first before talking.

After reading it, I was stunned for a moment and asked in disbelief: "Mr. Chen, is this price real?"

The price list that Chen Shulu handed him was not only not higher than the market price as he thought, but was actually about 10% lower than the market price.

Even the price of the commando team is clearly stated. The price of the commando team is only the same as the price in the labor market.

"Haha, how can this be false? These prices must be written into the labor subcontracting contract!" Chen Shulu laughed.


This chapter has been completed!