typeface
large
in
Small
Turn off the lights
Previous bookshelf directory Bookmark Next

Chapter 1057 Longteng Heavy Industry

"Another point is that the pipe gallery module itself can also be modularized. If necessary in the future, it can be disassembled and expanded..."

Finally, the introducer said seriously. An animation also appeared on the big screen.

The justice module is also modular in construction. It is directly assembled from multiple modules. If necessary in the future, these modules can be disassembled directly.

At that time, it doesn't matter whether it is expanded or reduced, or the functions are changed, or even adding a new pipeline layer.

The most important thing is standardization. Standardized parts. If that piece is damaged, just remove it and replace it.

At the same time, they can also be recycled and reused. If new changes occur in the city in the future, these modules can be recycled and reused.

Satisfied. After listening to the explanation, the officials of Guizhou Province were very satisfied. Such a module is in line with the development of Guizhou Province.

Although such modules are a bit more expensive than reinforced concrete modules, their service life, safety and convenience are much better than those of reinforced concrete modules.

At the same time, the construction speed is much faster than that of modules. Most reinforced concrete modules are cast on site.

It takes a lot of time to build. But this is not the case with Longteng Group's modules. The whole thing is broken down into small pieces.

Then it just needs to be assembled like building blocks. The whole module is trapezoidal. After the foundation is laid, it can be directly hoisted on top. Then the surrounding area can be sealed with soil.

Efficiency, the biggest advantage of modularity. Assemble next to the construction site. Then use large equipment to hoist the modules directly and put them down.

Nowadays, China's large-scale equipment is very powerful. The speed of excavating the land is very fast. In this era, speed means everything.

Officials in Guangxi Province are satisfied, and the investors are also very satisfied. Although the modules are more expensive than concrete modules, overall they are cheaper than concrete modules.

Because the construction period of this thing is short, workers' wages alone can save a lot. In addition to these, the construction should be completed as soon as possible and the funds should be withdrawn as soon as possible.

For investors, if they can recover their funds as soon as possible, they would rather earn less.

"Everyone, in addition to our module samples today, our Longteng Heavy Industry also brought some equipment. Please follow me to the back and we will demonstrate it for you on the spot."

The instructor said with a smile, and everyone immediately became interested after hearing this.

Longteng Heavy Industry, a heavy industry group under Longteng. It was established only three years ago. Although it was established for a short time, Longteng Heavy Industry has developed rapidly.

There was no way, they were rich. As soon as it was established, they annexed a very powerful heavy industry group in China.

In addition to annexing domestic heavy industry groups, Longteng Heavy Industry has embarked on a global acquisition journey in recent years.

Six heavy industry companies from Germany, the United States, Japan and other countries were acquired by Longteng Heavy Industry. They also conducted extensive research and development on various technologies.

In just three years, Longteng Heavy Industries has become the world's top heavy industry group. However, this heavy industry group has not made a profit. Not only has it not made a profit, it has also owed a lot of debt.

But even so, Zhang Fan continued to invest in this heavy industry group. In fact, the performance of global heavy industry groups has not been very good in recent years.

But Zhang Fan didn't care, Zhang Fan could afford to lose this small amount of money. With this money-burning attitude, Longteng Heavy Industries' technology skyrocketed like a rocket.

The entire inspection team was taken into the experimental base. The huge experimental base was very large.

After entering the experimental base, everyone saw a large equipment.

This device is too conspicuous and too big. It's like a Big Mac.

"Is this a bridge erecting machine?"

Some knowledgeable people couldn't help but ask. This thing is similar to a bridge erecting machine. It is usually most easily seen when building high-speed railways.

"Yes, but this is a comprehensive pipe gallery specially built..."

The instructor smiled and took everyone directly to the experimental base.

Inside the experimental base, there is a road one hundred meters long. This one hundred meters long road is a two-way eight-lane road.

Counting the isolation guardrails in the center and on both sides, the width is 30 meters in total. Moreover, this road is also of high standard and is built in accordance with the standards of urban main roads.

"Everyone, next we will demonstrate to you the specific process of Longteng Construction Group's construction of urban comprehensive pipe corridors within the city."

The instructor smiled and said, which immediately made everyone interested. Everyone stood there and looked at it curiously.

"The drill begins..."

With an order, the drill officially began. The entire test site became busy. Trucks drove in one after another.

The trucks were all filled with various assembly modules. The workers started to get busy, stacking the modules on the front section of the road and starting to assemble them very quickly.

While they were assembling, the engineering vehicles here also started to get busy. Two vehicles drove in. When the vehicles entered the road, the equipment behind the vehicles began to get busy.

The road crusher, accompanied by the sound of crushing, began to move forward. When the road crusher passed by, the brand new road behind had been broken into pieces.

The forklift from behind followed directly and scooped up the broken pieces and carried them to the muck truck to haul them away.

The efficiency of the two crushers is very fast, with a crushing width of 3.5 meters. During the crushing process, the speed can reach a distance of five kilometers per hour.

The crushing distance per minute is as high as 84 meters, which is very fast. A road of several hundred meters can be completed in a little more than a minute.

It only took five or six minutes for the two crushers to crush the entire hundreds of meters of road surface. Looking at the crushing speed, knowledgeable people swallowed their saliva.

This efficiency is so high that it is much faster than ordinary road crushers. The technology contained in this is very powerful.

Not only do you need to have strong technology for the materials of the crushing device, but you also need to have very strong technology for the crushing process.

After the crusher is finished crushing, the forklift has basically cleaned up the debris on the road, directly exposing the roadbed soil layer.

Just when everyone was curious, four excavators entered the scene. These four excavators were different from the excavators we usually see.

It's not a hydraulic trick, but a runner trick. The front excavating shovel is a disk type. This kind of excavator is generally used on super large excavators, and is generally used in mines.

But these four excavators seem to be smaller models. There is also a soil conveyor belt on top of the excavators.

At first glance, it looked like a combine harvester. Four excavators entered the site, and the wheels in front began to rotate. When the wheels rotated, soil was directly transported out on the conveyor belt.

The muck truck has been ready for a long time and is moving along with the excavator. The huge runner is like a huge roller. The width is slightly wider than the track of the excavator. As the excavator moves forward, everyone's eyes widen.


This chapter has been completed!
Previous Bookshelf directory Bookmark Next