Chapter 1325 Old City Reconstruction of Shanghai Stock Exchange
Phoenix Garden, Shanghai, is an old community. The house was built more than 30 years ago. Many infrastructures in the community have not kept pace. There is no underground garage, the house has no elevator, and the house design is not reasonable. These
The people who have lived here over the years have been living in uncomfortable conditions.
There are no developers here to renovate the old city in Shanghai. We can’t afford the renovation. Land in Shanghai is very expensive, and most companies simply don’t have such large funds.
After the house prices have fallen in the past few years, no one wants to move here anymore. However, it has been very lively here these two days.
Because a developer has come here, Longteng Real Estate has come, Longteng Real Estate and Zhang Group are going to open real estate here.
As a result, the people here have become demolished households. This makes many people living here very excited.
Longteng Real Estate's policy here is to relocate in situ. The admiration ratio is one to three. That is to say, if your house is originally 100 square meters, you will be directly compensated for 300 square meters.
This compensation ratio is very high. This is an in-situ resettlement, and the school district of the house will not change.
The delivery standard is also the finely decorated house of Longteng Real Estate. The finely decorated house of Longteng Real Estate is the kind that can be moved in, and it is a smart residence.
If you don't want a house, then pay cash compensation according to the current market price. But unless you are crazy, who would choose a house.
The most important thing is that the relocation time is very short. It only takes half a year to move back and settle in. The Shanghai Municipality also attaches great importance to this transformation.
This renovation will not only improve the living conditions of the people, but also increase fiscal revenue for the Shanghai Municipality. At the same time, the new houses will adopt the Forest City construction method.
Forest City has now become the main way for big cities to solve urban diseases. Look at what Blue Ocean City looks like now. Buildings of 1,000 meters each have turned the urban living circle into small circles one after another.
This is not only convenient for management, but also convenient for everyone. For the city, it does not reduce fiscal revenue and makes it more competitive.
Therefore, the scope of the demolition this time is very large. According to the plan given by Longteng Group, a thousand-meter building will be built here, and the one kilometer surrounding the thousand-meter building is full of forest and green space.
The entire building is a complete living circle, with schools, hospitals, shopping malls, and entertainment venues all very complete.
A building directly covers the surrounding area of nine square kilometers. The location of this thousand-meter building can be located in the area with the highest population density.
The population density of this place is 35,000 people per square kilometer. The number of residents involved in the demolition this time is as high as 300,000.
With such a large area, so many people, and so many houses, including residences and shops, the demolition is very complicated.
However, due to relatively good conditions and the formation of a team by the Shanghai Municipal Government, the entire operation went relatively smoothly.
It only took a week for the entire team to complete the mass work in the core area. Everyone signed contracts one after another and rented houses temporarily in the surrounding area with the rent compensation.
In the demolition area, after the personnel got into the car, the large equipment of Zhang's Infrastructure entered the site. These equipment attracted many people to watch. Because such large machinery is so big, many people have never seen it before.
Especially some intelligent demolition robots, which they have never seen before. In their impression, demolition requires either excavators or direct blasting. They have never seen robots used for demolition.
Now, they finally saw what robot demolition is. Next to a building, a group of demolition robots entered the building directly.
These robots were like spiders, quickly entering the top floor. Then these robot spiders acted directly. The cutting robots stretched out their sharp blades, which were made of special metal.
The sharp blade stretched into the wall like cutting tofu, and the entire wall was easily cut off by the sharp blade. Whether it was concrete or steel bars, they were like tofu in front of the sharp blade made of this special metal.
The entire wall was cut into pieces, without even a trace of dust. Specialized transport robots transported large pieces of wall directly away. These robots walked quickly down the outer walls of the building at a speed of
Very fast.
Under the busyness of these robots, the entire building was quickly cut into pieces and then transported away by ground vehicles.
Everything was silent, there was no sound of explosions, and no debris or ruins. It did not disturb the surrounding people.
At the same time, the types are also classified, and the simple walls are transported to a super-large crusher in the distance. After the walls enter the crusher and are crushed, they turn into very fine sand again.
And these things can be added to the concrete to build a new house. And the concrete beams with steel bars are sent to another equipment.
The concrete beam with steel bars enters the equipment and rotates once. After coming out, the steel bars and concrete are separated. The cement is directly shaken into slag and sent to the crusher to become raw materials.
The steel bars inside are recovered and recycled as a whole. Multiple robots cooperate with each other, and the speed is extremely fast.
A building with more than 30 floors disappeared in less than two hours. Not even the ruins were left, as if it had disappeared from the ground, and the foundations had been dug out.
Everything was going on in an orderly manner. The people around were shocked by such an orderly demolition.
A building disappeared in two hours. This was much faster than demolition in the past. In the past, demolition was done directly and then the residue was slowly pulled away.
Demolition is continuing, and the amount involved in the entire project is as high as hundreds of billions of yuan.
This kind of comparison also makes domestic real estate companies take a breath of cold air. They can't compare, they can't compare at all. Their hundreds of billions don't go through banks at all.
Longteng Real Estate and Zhang's Infrastructure directly took out the money. There was no financial pressure and there was no need to worry about running out of money.
Consumers can rest assured when it comes to Longteng Real Estate. They are not afraid that Longteng Real Estate will cheat people or fail to deliver. What they sell are fully decorated houses, which are all ready-made houses.
People with deep pockets have no choice but to return funds quickly. In the past, modular construction was fast enough. Now people directly use 3D printing technology, which is even faster.
The investment is big, and the income is big. A thousand-meter-long building, in addition to the relocation house, there are still many houses left.
During the above-mentioned holidays in the Shanghai stock market, the values of these houses are sky-high. Even if the current house prices are much lower than before, these houses can still be sold for a lot of money.
The Shanghai Stock Exchange has become lively, and large-scale construction has officially begun. The actions of the Shanghai Stock Exchange have also been noticed by many cities. They want to see what the results of the Shanghai Stock Exchange will be, and they regard the Shanghai Stock Exchange as a model.
.They wanted to see how this prototype project would turn out.