typeface
large
in
Small
Turn off the lights
Previous bookshelf directory Bookmark Next

Chapter 273 The second phase of the dormitory building

The Spring Festival is coming, and Sun Weihong and Han Shaobai will go back to the capital to celebrate the New Year together. Sun Weimin will be on duty this year, so they will not come back.

Sun Weihong and the others took a flight on the afternoon of New Year's Eve. Sun Dahai asked Battelle to drive, and the two went to the airport to pick them up. When the aunt and nephew met, they had some intimacy.

Sun Weihong was sent to the United States for further study last year and got married when she came back. After her wedding leave, she was arranged by the head office to work at Hua Xia Bank's Shanghai Branch and was officially promoted to director.

After the marriage, Han Shaobai's application for the Hanka project was also approved by the research institute. The research funding was not large, only enough to buy a few pieces of similar products on the market.

Together with several colleagues, he learned about the design ideas of other units through reverse cracking and prepared to start their development work after the Spring Festival.

They will fly back to Shanghai on the third day of the Lunar New Year because they will start working on the fourth day of the Lunar New Year. Fortunately, Sun Weihong is willing to buy air tickets now, otherwise, they will just take the train during the Spring Festival holiday.

Sun Dahai suddenly thought that the future Spring Festival travel rush would be directly related to the long Spring Festival holiday. If things were like now, there would only be three days of holiday during the Spring Festival (if applicable, the employer would have three and a half days of rest, and the holiday would be at noon on New Year’s Eve).

), I guess everyone may not go home to celebrate the Spring Festival every year.

Ouyang Huihui just returned to Shanghai from the capital a few days ago. She only stayed in the capital for one day, mainly to inspect the environment of Sanlitun and the podium of the dormitory area.

Because after the Spring Festival, the store in the dormitory area will begin interior decoration. Negotiations will also begin on the Sanlitun branch plan, as well as employee training. She may have to stay in the capital for the first half of this year.

She hurried back to Shanghai because the two stores in Shanghai this year would not take a break during the Spring Festival and would continue to operate. It was estimated that the store would usher in another consumption peak, and she had to go back to take charge.

This year, Decoration Lifestyle plans to open two branches in the capital, and will also open a store in Lan Kwai Fong Phase 3 in Hong Kong by the end of the year.

Ouyang Huihui has negotiated with all shareholders that no dividends will be paid in the first three years, and all funds will be used to invest in branches. Starting in 1986, dividends will be officially distributed to shareholders.

Things at the children's school are going very smoothly, and it is expected that the application will be officially approved soon after the holiday. Sun Yuanyuan has already flirted with Huang Lao and Jiang Xiuping several times, and she wants to enter the new elementary school with her brother.

She and Sun Dahe should be in primary school in September, as well as their little friend Jia Xiaoliang. His grandfather will soon be the principal of the kindergarten, so he will definitely go to Yingcai Primary School.

Because the fund is called the Talent Education Fund, everyone tried to save trouble and used this name for kindergartens, primary schools and middle schools.

The fund has been registered in Xiangjiang and is now waiting for government approval and land allocation before construction can begin.

The design sketch has been made, and it was designed by Sun Weiguo from China State Construction Engineering Corporation.

The kindergarten is a three-story building with a courtyard. The elementary school and the middle school both have four four-story buildings. Two of them are teaching buildings and administrative buildings. The other two are dormitory buildings, one for boys and girls.

A standard fully enclosed open-air sports field is shared by several schools. Between the primary school and the middle school, there is a 400-meter plastic track with a standard football field in the middle.

There are simple stands around, which cannot accommodate many people. They only serve as a closed sports ground and the cost is not high.

Because these buildings are very standard, and the school buildings do not need to be original or fancy. Therefore, the Sun family did not find a designer from Xiangjiang, but used several ready-made drawings designed by China State Construction Engineering Corporation to piece them together according to their needs.

Very mature.

If the approval can be obtained after the holiday, Sun Yuanyuan will really be able to catch up with the opening of the new school on September 1. Such a building will not be difficult for China Construction Company. In three or four months, the quality and quantity can be guaranteed

delivered for use.

It will take a little longer to build the new sports ground, but it can be completed before the end of the year. At most, physical education classes can be held on campus two months before the school starts, which will not affect the school's normal teaching too much.

What takes the most time is the indoor swimming pool and indoor comprehensive sports hall, and this is also the largest piece of all upfront investments.

However, the government has already approved the land for the second phase of the Shiweitian dormitory building. Several management people discussed it with the designers and decided to design it together with the second phase of the dormitory building, occupying one of the three floors of the slab building.

, and one layer.

The land for the second phase is right behind the first phase, and we decided to combine the dormitories of the two phases together.

The second phase of the dormitory building plans to continue to use the original tower drawings. According to the intervals of the first phase towers, four more towers will be built, and the same three-story podium will be used to connect the eight towers into two groups of east and west buildings.

In other words, the four 18-story towers in the second phase still have two staircases and four households on each floor, with three bedrooms and two living rooms and two bedrooms and two living rooms. Excluding the third floor and below for ground floor merchants, the four buildings can provide two floors.

One hundred and forty residential units.

The three schools plan to recruit a total of 200 faculty, security, cleaning, and water, electricity and civil engineering maintenance staff, who will be uniformly dispatched and managed by Shiweitian's property department.

The newly added housing in the second phase will be completed at once, providing a total of 200 housing units for three schools. In addition, 20 housing units for Food for the Sky and 10 housing units for Decoration Life will be supplied. There will also be 10 houses for mobile use.

In addition to the construction of four new towers in the second phase of the project, it is also planned to build a fourteen-story unit-style slab building behind the towers.

The three floors below the slab building are designed as an indoor swimming pool, indoor gym and indoor comprehensive sports hall.

The units in the flat floor are all large units, mainly for the company's senior leaders. There are five units in total, two staircases and two households, with construction areas of 180 square meters and 220 square meters respectively.

From the fourth to the thirteenth floor, there are a total of 100 large-sized dormitories. The fourteenth floor is a split-level apartment. Each unit has a loft of 60 square meters and two large rooftop terraces in the north and south.

An underground parking lot will also be built in the second phase, which will be seamlessly connected with the underground parking lot in the first phase, forming a parking lot that can accommodate more than 600 cars. On average, each household will have more than one parking space. This is Sun Dahai's

Strongly requested.

Fortunately, according to the project plan, the foundations of several buildings were laid at the same time, and the underground parking lot could be built easily. The increase in cost was not very high. Otherwise, Jiang Xiuping might have held another family meeting to join forces with Sun Weiguo and Li Cuifeng to criticize Sun Dahai.

Although in the eyes of Huang Feifei and others, he is a bit childish and wastes money and people. However, the reborn Sun Dahai believes that in ten or twenty years, everyone will thank him.

Although the podium of the dormitory building is both a ground floor shop and an indoor sports venue. But after the final completion, the courtyard of the dormitory area will be closed. Neither the ground floor shops nor people who come to exercise can enter the dormitory directly from the podium building.

Zone.

Even employees who live in dormitories have to go through the dormitory gate and go around outside if they want to go to the mall or go to the venue to exercise.

The entrances and exits of the underground garage are also located at the gate of the dormitory area. The elevator of each building leads directly to the underground floor. People in the car can take the elevator home from the underground parking lot without having to take a detour.


This chapter has been completed!
Previous Bookshelf directory Bookmark Next