typeface
large
in
Small
Turn off the lights
Previous bookshelf directory Bookmark Next

Chapter 12 No Conflict

After a day of hard work with Hua Renjie yesterday, Zhang Yunqing had a more perfect coping idea and method through a night of review and thinking. He came to the company's workstation early to go to work, looking at relevant drawings and waiting.

further development of the situation.

After a while, Zhang Yunqing saw the beautiful fifth division human resources manager Li Wenwen walking towards him. She gently smoothed her bangs that covered her eyes and said, "Mr. Zhang, I need to interview some people this morning."

Budget staff, I would like to ask you to help with some technical interviews for budget staff later."

Zhang Yunqing replied: "Gong Li, I just finished something important during this period. I'm still waiting for the time to report to Mr. Hua. I don't know if the time is right."

When Li Wenwen heard this reply, she said: "There is no conflict. I asked Mr. Hua this morning who would cooperate with me in today's technical interview. Mr. Hua asked me to find you, Mr. Zhang, to assist. When the time comes,

I will send you a QQ message and come to the small conference room No. 3."

After hearing this, Zhang Yunqing said: "What's your QQ number? I'll add you first."

Li Wenwen replied: "9382XXX68, I have been added as a friend. Please pay attention to the QQ information later." After speaking, Li Wenwen went to the small conference room No. 3 to organize the IQ test before the interview.

An hour later, Li Wenwen's QQ sent a message, "Mr. Zhang, come to Conference Room 3 to help with the interview."

After Zhang Yunqing arrived at the small conference room No. 3, he saw that Li Wenwen was the only one, so he asked: "Gong Li, what do you need me to do?"

"Gong Zhang, it's like this. This time we are recruiting general budget staff. Generally, 3-5 years of work experience is enough. So the main part of the interview is to pass the IQ test, conduct a technical interview, and discuss the salary and benefits after they are suitable.

You can apply for trial employment. Today we have three candidates who passed the IQ test, namely Xiao Liu, Xiao Guan, and Xiao Zhu. Now we invite you to come for a technical interview. If the interview is successful, please fill in this entry interview approval form.

If you fail the interview, you don’t need to fill it out." With that, Li Wenwen handed the three entry interview approval forms to Zhang Yunqing and went outside the conference room.

About a few minutes later, Li Wenwen brought a young man to the conference room No. 3, arranged for him to sit opposite Zhang Yunqing, and said to Zhang Yunqing: "Mr. Zhang, this is Xiao Liu who is interviewing for the position of budget clerk today. Waiting for you.

After interviewing Xiao Liu, I will notify Xiao Guan to come for the interview."

Zhang Yunqing nodded slightly to Li Wenwen and greeted Xiao Liu: "Hello Xiao Liu, I am an employee of the Commerce Department of the Fifth Department of Oriental Construction Co., Ltd., my name is Zhang Yunqing, and I will be responsible for your technical interview for the budget officer position today.

Part. Let’s get started. Please give a brief introduction to yourself first.”

After listening to Zhang Yunqing's arrangement, Xiao Liu on the opposite side replied: "Okay, Mr. Zhang. I have a bachelor's degree in engineering costing and have been there for 5 years. I have been working at Wanfang Construction Company in Kyoto for the past 5 years after graduation.

, I have been working on the housing construction site of Wanfang Construction Company. In the past few years, the modeling and calculation work I have completed by myself is basically civil engineering quantities, involving 5 buildings, with a total construction area of ​​about 200,000 square meters.

, are all high-rise buildings with reinforced concrete structures. The building area involved in the software extraction of steel bars is about 100,000 square meters, and the steel work volume is about 5,500 tons. The construction area of ​​the compiled bill of quantities is about 100,000 square meters, and the group's list controls the price

About 230 million. Mr. Zhang, I have finished introducing you."

Zhang Yunqing felt his eyes light up. Xiao Liu had done a good job summarizing it, so he said to Xiao Liu: "Okay. You can explain these key work experience data so clearly when introducing yourself. This shows your summary ability.

Yes, you have plenty of practical experience. What is the biggest work-related mistake you have made in the past five years?"

Xiao Liu was stunned and felt a little embarrassed, "Gong Zhang, this Fan Cuo has just been working for about a year. He feels that his technical level is pretty good and he should have passed the test, so he seems to do it according to his own wishes. No."

Strictly follow the regular basic steps of our cost work. At that time, the leader arranged for me to calculate the project quantities of a high-rise building, and at the same time gave me the review version of the architectural blueprint and the electronic version of the CAD drawing. I did not check the architectural blueprint and the electronic version of the CAD drawing.

Whether it is a one-piece production, I can directly start modeling and calculation based on the electronic version of the CAD drawing. When I painstakingly spent about a week completing the calculations and reporting the results to the leader for review, the leader discovered that my modeling

The calculated building area is 45,000 square meters, but the building area in the approved version of the architectural blueprint is 41,000 square meters, a full 4,000 square meters less."

Upon hearing this, Zhang Yunqing asked: "Normally, this kind of situation would not happen. After such a big incident happened, have you figured out what happened later?"

Xiao Liu replied: "After such a big difference, there is definitely no way to use the result, and everyone is very depressed. First, the leader helped me sort out important work sequence issues, method issues related to calculations, and major

Things to pay attention to, etc. The second is to ask clearly what happened with this wrong drawing. It turns out that the design institute made two versions when designing this building. The version with a building area of ​​45,000 square meters exceeded the land planning standards.

According to the requirements, the builder of this building has been trying to change the plan to increase the floor area ratio, but gave up after a long period of efforts without success. So the design institute made this version with a construction area of ​​41,000 square meters, and successfully passed the drawing review.

When I sent the architectural blueprint to the builder, I sent the correct stamped version, but because the designer was so tortured by this incident during that time, he was not in good spirits, and there were too many related electronic files.

I selected the wrong attachment when sending the electronic version of the email. In this way, after selecting the wrong electronic version of the drawing, the design was sent to the builder, the builder sent it to the construction unit, and the leader of the construction unit sent it to me, and I directly followed the electronic version.

Engineering quantity calculation. It went through four stages, but no one checked and no errors were found."

Zhang Yunqing said: "Then your lesson is quite profound. So from a professional perspective, which quotas are you familiar with?"

Xiao Liu replied: "Gong Zhang, speaking professionally, the quotas I am familiar with include civil engineering quotas and decoration quotas. Of course, there is another limitation. I am only familiar with the quotas and pricing standards in the Kyoto area."

Zhang Yunqing said: "Then you have never had any contact with municipal quotas or garden quotas?"

Xiao Liu replied: "Mr. Zhang, because all my previous experience in Wanfang Construction was housing construction, I had no real contact with municipal quotas and gardening quotas. Just these two majors, in each real estate project

They all have them, so I have seen their main processes and have a little understanding of them, but I am not very familiar with them."


This chapter has been completed!
Previous Bookshelf directory Bookmark Next