Zhang Yunqing took the engineering quantity calculation formula document handed over by Li Xixuan and started to read it.
Li Xixuan, on the other hand, sat opposite Zhang Yunqing's desk rather uneasily, picking at her fingernails to relieve her nervousness.
Zhang Yunqing spent more than ten minutes reading the engineering quantity calculation formula file calculated by Li Xixuan.
The electronic version of calculations transferred on the computer has been transferred.
After Zhang Yunqing decompressed it, he briefly browsed the electronic version of the calculation file.
Zhang Yunqing arranged for Li Xixuan: "Please introduce the order of your calculations this time, matters needing attention, basic ideas, etc. so that I can fully understand the calculation ideas, methods, and methods."
Li Xixuan replied: "Mr. Zhang, I have never communicated like this before. I'm afraid I didn't speak well."
"It doesn't matter, just tell me more. I have never asked anyone this before. We will always face new problems at work. As long as we calm down and think carefully, we will always find a solution.
.”
"Okay, let me try it."
"let's start."
"Well, after I got the bidding list for this project, I imported the list into an Excel-type table file in the pricing software. It took me almost two hours to become familiar with all the names of the bidding list.
, project characteristics, units of measurement and bill quantities.
Then, I first read the paper version of the bidding and construction drawings.
After reading the paper documents of the bidding and construction drawings, it took me almost half a day to become basically familiar with this set of bidding and construction drawings.
Well, what we see later is the electronic version of the bidding construction drawings.
On the CAD drawing, the first thing to look at is the general floor plan. On this drawing, I found the places where the dimensions are marked horizontally and vertically. I used the measurement tool function of the software to check whether the plane dimensions and the marked data are
Consistent.
So the proportions of the drawing are correct.
Well, then, the preliminary calculation work began.
The order of calculation is to find the bill of quantities item in area A in the bidding list.
According to the items in the bidding bill of quantities and combined with the bidding construction drawings, the calculation formulas are listed item by item to calculate the corresponding workload.
After completing the calculation, go back to the plane index drawing in area A, and carefully check the index content drawings one by one with the bill of quantities items in the bidding list in a clockwise direction, whether it is a garden construction professional, a hydropower professional, or
For landscaping professionals, no items in the bill of quantities are omitted.
What is a bit problematic is that the number of individual trees listed on the drawing according to the legend is different from the number in the bidding list. Some are more and some are less. The number of lamps is exactly the same as the quantity in the bidding list."
After hearing this, Zhang Yunqing nodded slightly and said, "Well, it's quite clear. Have you checked the earthwork quantities?"
Li Xixuan said: "The amount of planting soil is calculated based on the planting area multiplied by the average planting soil thickness. This is basically consistent with the list of bidding quantities. The excavation and filling of large earthworks needs to be carried out according to the square grid.
The calculation and verification part requires the use of professional software, which I don’t know yet, so there is no verification.”
Zhang Yunqing said: "When you are free, find the measurement engineer Lin Jun. If you are in a hurry now, just ask him for the results. But in the future, you have to find him and find out what software he used for calculation."
For earthwork, install this software on your computer and you can calculate the amount of earthwork by yourself at any time in the future.”
Li Xixuan asked: "Will he teach? I'm not familiar with him at all."
"No one is familiar with it, so since we are working on the same project, it is natural for everyone to help each other. You should search for it yourself first, and I can teach you the best. If you can't teach me, then tell me later and see if you can find it.
A practical solution.”
"Okay, I'll try to find measurement engineer Lin Jun later."
"How do you calculate the earthwork for your water and electricity pipe trench?"
"There is no way to calculate this. The quantity is not large, so we use the bidding quantity."
"He uses square measures as the unit, not meters, but he still needs to do a simple calculation. After you calculate the length of the pipe trench, you can simply multiply it by a coefficient of 0.45, which is basically the excavation and filling of the pipe trench.
Party’s bill of quantities quantity.”
"Where does this coefficient come from? I haven't seen it in the quota here in the South China Sea."
"This is a quota regulation coefficient in other provinces. It has a certain theoretical basis and reduces the difficulty of our work when calculating engineering quantities."
"Okay. Mr. Zhang, do you think there is anything I need to pay attention to in the project quantities I calculated?"
"The time left for us to complete the bid clearance is getting closer and closer. You must step up your bid clearance work during this period. Be prepared to work overtime at night and on weekends. You cannot relax at all until the bid clearance work is completed.
Can you understand?"
"Can understand."
"Can it be done?"
"Don't worry, Mr. Zhang. Although my current technical level is not very good, I have always had the spirit of hard work and perseverance. I will complete this challenging task of clearing the bid on time."
"Okay, thank you for your hard work. Go and do your work."
"good."
After Li Xixuan left Zhang Yunqing's desk, she returned to her work station and wanted to continue calculating the engineering quantities of the bidding construction drawings.
Surveying engineer Lin Jun came to the office of the Ministry of Commerce. Li Xixuan hurriedly said to Lin Jun: "Hello, Engineer Lin. I was just about to ask you for help, and you came here. It really said that Cao Cao Cao Cao has arrived."
Surveying engineer Lin Jun asked with a confused look on his face: "Oh, beautiful Xiaoli, what do you want from me?"
Li Xixuan said: "I am currently calculating the quantity of the project to clear the bid. There is one task that I don't know how to do, so I would like to ask you to help me calculate it."
Surveying engineer Lin Jun said with a smile: "Do you know how to calculate the amount of large excavation and filling earthworks?"
Li Xixuan replied: "Lin Gong is smart and knows it as soon as he mentions it. How about you arrange time to help me do the math?"
Surveying engineer Lin Jun replied: "I'm afraid I've been very busy these two days. There's a rush for work at the site. As you know, there are a lot of things that need to be worked overtime. I'm very tired every day."
Li Xixuan thought for a while and said: "Don't panic. Let's do this within these two days. I will send the relevant electronic version of the drawings to your QQ mailbox. You will tell me the results within ten days after calculating it."
Data, okay?"
Measurement engineer Lin Jun replied: "I have no problem with such a long time. Just send me the file first. I will try my best to find time as soon as possible and send you the result file after the calculation is completed."
That's it, I still need to find your Mr. Zhang, it's a bit urgent."