"What railings are you thinking about building now?"
"After discussing with Liu Yuze, the on-site director of the Party A, many times, we confirmed that it was built to build imitation wood grain railings, which also looked more ecological in the green space."
"OK."
"Mr. Zhao, look here, the swimming pool is located on the roadside and the building.
The original hedge was designed at a height of 1.5 meters.
In this way, during actual use, I found that the privacy is very poor.
Many guests who come here to use the pool are reflecting this problem.”
"Well, Xiaoshan. This seems to be a little problem now, especially the closer construction directions, which seem to be more serious."
"Yes.
Close to the direction of the building, we are thinking of adding some tall coconut trees with full crowns, big king coconuts, etc., and at the same time, some osmanthus flowers with full crowns, etc. on the middle floor.
In this way, it not only solves the problem of embarrassing vision, but also completely improves the landscape effect here.
It turned out that the 1.5-meter-high hedge needed to be demolished and moved to some places similar to private gardens to make the best use of the goods.
Now the location of the hedge here is to rebuild a new 3-meter-high hedge and plant some faster-growing vine plants."
"This suggestion is OK. Does the Party A's Haze agree?"
"The on-site person in charge of Party A is called Liu Yuze. This is just my idea at the moment. Since the company controls funds, I don't know if it can be implemented, so I haven't dared to tell Liu Yuze yet.
When he asked, I could only say vaguely that I was still thinking about the plan, but I didn’t say it clearly.”
"I see, you come up with your swimming pool, don't you have any places to wash your feet?"
“Yes, this is also a problem.
But it’s easy to solve the problem. At this location close to the hedge, you can just bring a tap water pipe over and install a few faucets, which won’t cost much money.”
The three of them finished watching the swimming pool and continued to walk in the community to check.
There are few amusement facilities and very few equipment to exercise.
There is a resting pavilion without design seats, and wooden stools are required to be added at least on the two opposite sides of the pavilion.
Some floor paved edges are handled roughly and ugly. This is a technical level issue and has nothing to do with design. If it is to be handled, the cost can only be borne by Western buildings themselves.
Zhao Manfu said on the spot that this similar problem was caused by the problem of using the technical level of workers during construction of Western buildings. He chose some important nodes. Our Western buildings spent money to repair and improve the landscape effect, but they needed to control the total cost.
, hope to control losses within 200,000.
Song Xiaoshan also expressed his gratitude to Zhao Manfu on the spot, saying that the leader of Zhao Manfu's position never made any statements on this issue, and everything was left to the project department to solve.
The project department did not dare to use this brain to actively improve the landscape effect without the clear support from the leader.
Song Xiaoshan also relayed the opinions of senior executive General Yuan Fang:
Party A leaders expressed dissatisfaction with the landscape effect of Western architecture in the first phase of the Qionshan Bowan project, and hoped that Western architecture could actively propose plans to improve the landscape effect of the current first phase of the project.
Otherwise, there would be no reason for the second phase of the project to be implemented again by Western buildings.
Zhao Manfu expressed that Song Xiaoshan's opinions were occasionally mentioned by Song Zhiyuan, the president of the business unit.
Since I have come here to take over the management of the project here, I will definitely do my best to support the work of the project department.
I hope Song Xiaoshan can let go of his hands and feet, what are his opinions? What are his ideas? Just quickly form a written form and calculate the corresponding budget, including the cost, and quote the quote? Data involving cost quotes? Project department forms
Later, it was sent to Zhang Yunqing for review.
Song Xiaoshan said: "Please rest assured by Mr. Zhao? I have been brewing these plans for landscape improvement and transformation thousands of times in my mind.
After I went back, I arranged to form text and corresponding drawings.
Cost and quotation data are also compiled.”
Zhao Manfu asked, "How many days will it take?"
"It is expected that it will take about a week to communicate with Party A's Liu Yuze while completing the plan."
"Then after these landscape improvement plans are passed, will Party A be willing to pay the corresponding money? Right?"
"Yes? But what Party A hates is also speechless."
"What's going on?"
"What they said is that the modification is good and the effect is satisfactory. If it is not good, it will be the best result if I don't let me demolish and rebuild it."
"Whether the landscape is good or bad, it is a matter of opinion. How can they judge this?"
"I heard what the Party A Liu Yuze meant? First of all, we must be satisfied with the landscape improvement plan, and secondly, the results are also satisfactory. Also, isn't his community a hotel-like nature?
Their investigation opinions on customers are also important reference opinions.”
“That’s it.
Just go to Party A to communicate and implement it with confidence.
I have no problem in the general direction.
One particularly important thing is whether there is a limit on their landscape improvement budget, or something like that, you need to find out clearly."
"I asked, I said that there is no limit, no amount of money, just care about the landscape effect."
“I personally feel that their statement is just a plan to help him think of landscape improvement.
You should do this. When they are satisfied with the plan, they will quickly report the budget documents and see what Party A's reaction is.
If it exceeds his budget, you will definitely ask you to adjust the plan.
If his budget is still far behind, he will show some of it.
Are you familiar with the people who are working on the cost of Party A?”
"I'll be familiar with it."
"Then you usually have to contact more and make more appointments to have a drink and chat, and maybe you'll find out about the budget cost limit we want to know."
"Okay, Mr. Zhao, I'll find some time to make an appointment with him."
"Can you ask him out today? If you happen to be there, Yun Qing and I will meet him. It's also considered to be acquaintance with people first."
Song Xiaoshan and the person in charge of Party A called to make an appointment to have a meal together in the evening, because his leader came and wanted to visit the other party. The other party's reply was a coincidence. He attended the training meeting organized by the company in Kyoto these days.
Let's make an appointment after you come back.
Song Xiaoshan asked Zhao Manfu again if Zhang Yunqing could live in the project department here, saying that the office and accommodation of the project department now rented a five-story house, and the rooms were completely enough.
Zhao Manfu said that if there is a place to live, let’s arrange to live first.
But at the beginning, you might have to go between the Qionshan Bowan project and the Nanshan project, and you can live in more places wherever you have more things to do.
Song Xiaoshan then arranged for the project finance department to buy daily necessities for the two.