It is very close to Yanmiao Lake, not far from the town at the foot of the mountain, connected to Yanmiao Lake, and just outside the Haixin Villa on the mountain by the diversion river of Yuanyin Lake.
Now, after the Mo Zhilun incident, in this situation, everyone just thinks that such an accident is certainly not a problem with the quality of Li Gu's project.
It was obvious that the water monster had appeared again.
And it's very real, the water monster is in Haixin Villa, right in Long Yuanzi's house.
You must know that the dam that was washed away was almost 2 meters wide. It took two full days, six full rows of wooden piles, bone fixation, and repeated compaction of the dam.
Very strong.
Although it is a temporary small earth dam, there is no flood. Such a dam is not such a calm river. The water without waves can be flushed away at once, and it can be flushed away at once.
It must have great external force to break away.
It can be seen at a glance that there is such an external force and such a powerful force. Since it is not a current, it cannot be a small fish at this time, even a big fish.
Who? Who can have such great power?
Obviously, there are only water monsters.
There is only one most reasonable explanation for this situation, and that is that it was caused by the water monster.
What a surprise, the water monster appeared again and actually came to Haixin Villa and Long Yuanzi's house.
Many people watching the fun thought so, and Long Yuanzi would certainly think so too, knowing that the water monster incident had happened again and again.
And this time, it happened in his house.
Although I'm not sure if it was a water monster, something must have happened.
However, even if it is true that a water monster has occurred, I cannot just say so, think so, let alone make it public. I also believe that a water monster has occurred in my house.
Otherwise, the reputation of Haixin Villa and my own reputation that I have worked hard to build for most of my life will be half destroyed.
And after half of it is destroyed, people living in Haixin Villa will still be in fear and panic every day, which is not good.
So he could only pretend to be calm, silent, and calm, pretending not to know that the water monster had come to his village.
At this moment, he just hoped that the dam would be completed as soon as possible, and that there would be no more accidents after the dam was blocked, so that people in the villa would not be panicked and rumors would be rampant.
As long as Li Gu completes the dam again and prevents it from collapsing, he can prove that the legend of the water monster in his house is just a rumor and not true.
However, at this time, Long Yuanzi also heard and felt, and heard the rumors that were being spread by the onlookers. The onlookers were all spreading rumors that there was a water monster, and they were all rumoring that there was a water monster on their village.
I know that this rumor cannot be avoided. You must know that if everyone believes that there is a water monster in Zhuangzi, it will have a great impact on Zhuangzi's reputation.
what to do?
Only to refute the rumors, in order to maintain the reputation of Haixin Villa, Long Yuanzi had no choice but to resort to crisis management and no longer believed that the project did not have quality problems, but that it had quality problems.
Long Yuanzi looked at the small dam and the remaining wooden piles on the dam. He saw that the width of the small dam was not as wide as the two meters that Li Gu said. Originally, it was only used temporarily.
The small dam that blocks water does not have to be as wide as two meters. It is not strange to say it is two meters wide.
I formally measured the width of the collapsed dam with a larger step. The width was only a little more than two steps square. It seemed that the actual width was less than 2 meters.
So the crisis public relations officer quickly said: "It seems that the dam is not as wide as two meters as previously said, and because there was a problem with the wood used before, and the mud under the flowing water was too deep, the dam collapsed. Don't worry, everyone.
We will build another dam again."
It sounds reasonable, and it seems to be true.
After Long Yuanzi finished speaking, he gave Li Gu a wink.
Li Gu has been a housekeeper for so many years. He is so smart. He immediately went on to say: "Well, yes, because the wooden piles used before had insect holes, which were not found and the mud was not cleaned up properly, which led to the loss this time and caused the dam to collapse.
, it’s my Li Gu’s fault, I, Li Gu, will be severely punished.”
Long Yuanzi didn't want to impose heavy fines, he just wanted to spend money to eliminate the disaster and let Li Gu start blocking the dam again.
It would be better to make the dam more solid.
Long Yuanzi just said: "There is no need for heavy punishment for the time being. Li Gu, just hurry up and build the water-blocking dam again."
This time Li Gu did not dare to neglect, but now, once the dam is breached, it is not just a simple matter of the tofu water-blocking project being destroyed and washed away.
But can crisis public relations solve rumors?
It's not that simple. Now rumors have come. It is said that there is something really strange in the lake, and it is not Mr. Xianjun who appears, but there is a real water monster. This water monster has even arrived at Haixin Villa.
It was passed down to ten, and it was passed down by hundreds. Moreover, this time, countless people witnessed it with their own eyes and watched in person. The townspeople were concerned about the rumors. What everyone was rumoring were all rumors. The water monster appeared again, and this water monster came.
Arrive at Haixin Villa.
It turns out that this water monster is no longer in Yanmiao Lake in Xianjun Mountain. No wonder I have to go to the mountain to plow the road, and I have never encountered any "abnormality".
Instead, it turned out that this abnormality appeared at Haixin Villa, not far from the foot of the mountain and not far from the town.
At this time, rumors spread that the water monster was at Haixin Villa.
Soon the whole town knew about it, so the matter of blocking Yuanyin Lake became more urgent.
However, when the handymen hired from outside saw this situation and heard the rumors, they were afraid of the danger and stopped working. Most of the handymen hired temporarily stopped working regardless of how much extra money they had to pay.
There's nothing we can do if we don't have enough manpower, and there's nothing we can do if there are rumors. Some things must be done, and they must be done.
We had no choice but to mobilize all the women and children who could work in Haixin Villa to contribute to the villa. However, women and children have weak physical strength after all. This time, because they were given six-star reinforcement treatment, the amount of work was even greater.
Li Gu also learned from the experience and lessons learned last time this time.
Carbonized wood piles were replaced with longer and harder ones that are unlikely to contain insects. The soil used to build the dam was also replaced with the strongest proportions. The original main component was soil, and the main component was replaced with solid stone.
The width of the dam was also widened to a true 3 meters.
Then move the position of the dam back and forth, from the mouth of the diversion river to under the wall inside the villa, to reduce the erosion and impact of the diversion river on the dam.
The solidity index is completely in accordance with the highest level of five stars+ and reaches the level of six stars+.
And the security level is increased for all materials 24 hours a day, and dedicated personnel are on duty 24 hours a day to monitor the safety of materials.
In addition, because building such a dam requires more and more expensive materials, Li Gu even built a simple shack and lived next to the materials to prevent the loss and damage of the materials to ensure the success of this project.
, foolproof.
Be serious and responsible, and be determined to do this project well.