Chapter 424: Yu Qingyang's Poisonous Tongue (seeking a monthly ticket)
“Although the renovation of the municipal pipe network is an investment by our company, and the standard we set at the beginning was to complete the renovation, instead of talking about the cost, we will do the work for the money.
But! I still want to say a few words, Designer Bai, Mr. Bai, there is really no need for you to save money for our company!" Yu Qingyang took the microphone and said with a smile.
After the German Carter Bess Water Treatment Company reported the design ideas, the next step was the design of the municipal pipe network transformation.
Regarding the municipal pipe network, Yu Qingyang had to speak up.
"Mr. Bai, first of all, our company is not short of money. We are a state-owned enterprise. We come to Jeju to invest and do people's livelihood projects!"
So, you really don’t have to save money for me!
For municipal rainwater main pipes, you choose 135 concrete pipes! Do you think it is enough?”
"Mr. Yu, we have collected the rainfall in Jeju City in the past ten years, and after careful calculation, we have concluded that using 135 concrete pipes can fully meet the urban drainage requirements?" Mr. Bai from the Jeju City Architectural Design Institute was very dissatisfied with Yu Qingyang's doubts.
, came up with data to refute Yu Qingyang.
"Stop, you guys don't translate what Mr. Bai just said!
Teacher Lu, please accompany Antonio and the others to the nearby lounge for a cup of coffee!" Yu Qingyang ignored Mr. Bai and shouted to the German translators who were about to translate for the German experts to stop.
Then Yu Qingyang said to Antonio in English: "Mr. Antonio, we have some internal matters to deal with now. Please go next door to have a cup of coffee and take a rest!"
The Jeju City Government officials at the rostrum didn't know what was going on, why Yu Qingyang didn't let the translator translate what he just said, and even invited the German experts out.
"Mr. Bai, do you know why I invited the German experts out?
I'm afraid you will throw people abroad!
Did your teacher teach you that the selection of outdoor rainwater pipe diameters is calculated based on the average rainfall in the past?
Do you have the nerve to say that you have made careful calculations?
If I had a student like you, I would be so angry with you that I would climb out and drag you down with me!" After the German expert left, Yu Qingyang started to sneer at Mr. Bai.
"Mr. Yu, please don't insult others. Why should the diameter of rainwater pipes not be chosen according to the amount of rainfall?"
“It is calculated based on the intensity of heavy rain!
It is calculated according to our Jeju City’s rainstorm intensity formula!
Oh! Jeju City does not have a rainstorm intensity formula, so you can refer to Quanshu City’s.
Do you know what the rainstorm intensity formula is? You can consult the comrades of the Jeju City Hydrology Bureau!
Don’t take for granted the rainfall over the past ten years to calculate your so-called storm drain diameter!
Even if you read the "Water Supply and Drainage Design Manual", you won't make such a stupid mistake!
Or you can just listen to your subordinates’ opinions!
I don’t believe that your Jeju City Architectural Design Institute doesn’t know the formula for rainstorm intensity!”
After listening to Yu Qingyang's words, the Jeju City leaders on the stage finally understood what had happened, and all of them had gloomy faces, as if it was about to rain heavily.
As the director of the construction committee in charge of the higher-level unit, Shen Qixin's face turned as dark as a storm.
Shen Qixin kept scolding his mother in his heart. In order to fight for their lives and show their face, he really didn't have any face at all!
What's the result?
These guys throw their faces to the ground and kick them!
After that, he was kicked into the sewer.
Shen Qixin felt ready to strangle Mr. Bai to death.
"Haha! Mr. Yu, our Jeju City is a developing city, lagging behind many developed coastal cities in all aspects, so we need investors like Mr. Yu to help us develop!
Regarding the renovation of the municipal pipe network, if Mr. Yu has any other suggestions, please share them with us so that we can focus on improvements!
Deng Gong once said that reform and opening up is about crossing the river by feeling the stones.
We cannot be afraid of making mistakes in our development. As long as we have a humble heart, we will correct our mistakes! One day, we will be able to catch up!" Zhang Hua spoke, easing the awkward atmosphere in the conference room.
“Also, regarding sewage pipes, the maximum fullness of the pipes must be considered, and cannot be calculated based on the current urban sewage discharge volume!
We need to have a lead time! We need to consider the future increase in urban population!
For example, under the rural-to-non-agricultural-to-non-registration policy introduced a few years ago, you can spend money to transfer your rural-to-non-agricultural household registration.
Who knows whether household registration restrictions will be lifted in a few years?
Furthermore, with the development of cities, a large number of foreign and rural populations will inevitably flow into the cities.
The increase in these populations will increase the pressure on urban sewage!
Our sewage pipes can't be renovated every few years, right?
Therefore, we must fully consider the factors of population increase!
Moreover, I suggest that you might as well be a little bolder and a little ahead in this regard!" Yu Qingyang also commented unceremoniously.
"Haha! Okay! Director Shen, did you hear what Mr. Yu said?
Our God of Wealth is not afraid of spending more money, so there is no need for you to save money for him!
In the renovation of municipal pipelines, we must be bold and proactive. You can seek advice from experts in developed coastal cities!
Regarding municipal pipeline matters, you must personally handle it and not make the same mistake again!
Fortunately, Mr. Yu just invited the German experts out in time, otherwise we would be really embarrassed and sent abroad!" At the end of the sentence, Zhang Hua's expression became serious.
There is no need for him to argue with a designer, but he can directly cause trouble for Shen Qixin.
"Yes, the mayor is right, I will definitely take care of this matter myself!
We would also like to thank Mr. Yu for the valuable advice he provided us!" Shen Qixin quickly stood up to express his stance.
"Okay, now the Water Conservancy Design Institute will report your design ideas!" Zhang Hua directly named the design institute.
"Hello mayor, hello... hello leaders, I... our Water Conservancy Design Institute's design plan for the dredging quality of the old canal is..." Liu Xueqing, the chief designer of the Water Conservancy Design Institute, stood up and gave a speech to the people on the stage.
The leader bowed and stuttered nervously.
After Liu Xueqing from the Water Conservancy Design Institute finished speaking, Zhang Hua took the initiative and asked: "Mr. Yu, what do you think about the dredging plan of the Water Conservancy Design Institute?"
“Nothing to say, we comrades from the Jeju City Water Conservancy Bureau are engaged in river dredging, dredging, and embankment reinforcement work all year round!
They are also more familiar with the situation of the old canal than I am, so I won’t say more!” Yu Qingyang smiled and shook his head.
River dredging is also an important part of the old canal management and the old canal cultural corridor project.
However, there is really not much to say about the dredging project.
The Jeju City Water Conservancy Bureau has been doing this all year round and is more familiar with it than Yu Qingyang.
Just when Liu Xueqing and Pei Yanbing, director of the Water Conservancy Bureau, were exhaling, Yu Qingyang suddenly spoke again: "However, I have a small suggestion!"
Pei Yanbing and Liu Xueqing's hearts suddenly lifted.
"Mr. Liu just mentioned that the cofferdam will be cleared in sections, and a waste truck will be used to transport the silt to the designated silt storage point.
Everyone knows that freshly dug silt contains more water!
The muddy water seeping out of the black and smelly sludge during transportation will seriously damage the city's sanitation and affect the city's image!"