Song Xiaoshan said with a dark face: "Sister Jiang, is it even if the number of workers has been counted clearly now?"
Sister Jiang replied: "I have counted it clearly. Today, thirty workers came according to your requirements."
Song Xiaoshan arranged: "Okay.
Now everyone takes the workers with me and assigns the workers.”
"Zhou Qingchun, today you are responsible for drying the water in this swimming pool and re-grinding the mosaic sewing with white cement.
Look at how many workers do you need?"
"Mr. Song, the water in this swimming pool is full. According to the designed pipe diameter, it will take at least half a day to put all the water, so I don't need workers. In the afternoon, I can allocate three workers to me."
"Okay, Sister Jiang, you will assign him three afternoons to the workers who will follow Zhou Qingchun."
Sister Jiang pointed at the three workers in the first row: "You, you, you followed Worker Zhou in the afternoon and recognized him, and did not forget him. But this morning, we will go to other places to accept the task arrangements together."
Song Xiaoshan said to the garden construction engineer Zhao Dajin and the greening engineer Wang Bin: "You two will discuss the improvement of the landscape by the swimming pool now, and where workers can be arranged today, let's make sure now."
Zhao Dajin, a garden construction engineer, said: "This hedge is too short to completely remove the ones here to other places."
Greening engineer Wang Bin replied: "You can demolish it and put it in the places where I finger it, and fence the private gardens of several of their houses."
Zhao Dajin, a garden construction engineer, said: "Okay, after this period is demolished today, it is estimated that eight workers will be needed, and two workers will be needed to transport them. Wang Gong, how many workers will you need to encircle them again?"
Greening engineer Wang Bin replied: "At least a dozen workers are needed."
Song Xiaoshan asked, "Then you two used it by the swimming pool and took twenty-three workers? Do you, the twenty workers behind you, want to finish the work in one day?"
"yes."
"Yes, Mr. Song."
"There is no need to be so urgent. Our current demand is to move comprehensively.
In this way, the number of workers in demolition and reconstruction of this hedge was reduced by half and planned to be completed in two days.
Sister Jiang, you assign ten workers here to obey their arrangements."
Sister Jiang appointed ten workers to the park construction engineer Zhao Dajin and greening engineer Wang Bin.
Park construction engineer Zhao Dajin and greening engineer Wang Bin brought ten workers to relevant demolition points, and arranged how to demolish the reconstruction points, and after the construction, they returned.
Park construction engineer Zhao Dajin asked Song Xiaoshan: "Will the place where ecological railings are built by the lake be demolished now?"
Song Xiaoshan smiled and said, "That place is just a little turf. In the future, after our ecological railing manufacturer enters the site, they can handle it themselves.
Let's go, everyone follows me."
Song Xiaoshan walked in front and walked to a pavilion and said, "Zhao Dajin, look at the stone on the pavilion, some of them were hollow and some were broken. We turned out to have a little stone. I want to demolish it today and repair it."
Park construction engineer Zhao Dajin asked a little embarrassedly: "Sister Jiang, I know that your workers are basically greening workers. Are there any one or two masters who have done laying? Among the workers who came today."
Sister Jiang said: "It seems that there is one today, but it doesn't have tools. Which master, stand up and look at my brain."
A male master stood up and said, "Sister Jiang? Are you a noble man forgetting too much? I am the only one who works as a shopkeeper? You can't even remember it?"
Sister Jiang said embarrassedly: "I remember this time. You should go back and bring the tools and deal with these stones for him."
"Who should I ask for cement, river sand? And there is still new stone?"
Zhao Dajin, an engineer at the garden construction, hurriedly answered: "Master, come to me, let's leave your phone number? Come to me when you come later? I'll take you to see where the materials are."
"Generally speaking, I have to provide a small worker with me to carry the materials."
"User matching? Sister Jiang, arrange another young worker to wait here. After the arrangement is completed, I will come back and take the young worker to our warehouse to find cement, river sand, and stone."
Sister Jiang appointed another small worker to stay in the pavilion and wait.
Song Xiaoshan led the way to the edges of several tree ponds in front of the pavilion and arranged: "Sister Jiang? Here are five workers who will pick out the stones in the tree pond and the flower pond, and the planting soil on the surface of the tree pond and the flower pond are flat. The weeds must be pulled and thrown by hand, and you cannot cut them with a knife."
Sister Jiang replied, "Okay." She appointed five more workers to stay? She explained the details of the work.
Song Xiaoshan asked, "How many workers are there left?"
Sister Jiang replied: "Ten people were left first? Two people were left later, and now five people are left, not including me, and twelve workers have not arranged specific tasks."
Song Xiaoshan said: "I will not arrange the remaining tasks in detail. The art director Xiang Qi and the greening engineer Wang Bin will work with you to make a good start around the first phase of the project.
My request for the dead leaves to be removed, dead trees to be removed, and some spherical plants to be pruned.
Priority is given to the places that people can see easily, and the time for handling places that are not easy to see is ranked behind.
Wang Bin, do you understand?"
"I'm clear, Mr. Song."
The art director Xiang Qi asked: "What plants can be pruned and how to prune it can be handled according to my opinion? Mr. Song."
Song Xiaoshan agreed readily: "Of course it is done according to your opinion, but it is best for you to teach the workers. Otherwise, what you say one by one will not only be very tired, but also inefficient, which will lead to some workers being very tired, while others have no work to do."
The art director Xiang Qi said unhappily: "I know that you just need to give me the workers and do the specific things, don't worry about it. I'm responsible for using them to make the artistic effects."
Song Xiaoshan replied: "Okay, thank you three, bring the remaining workers to arrange their work.
Remember, it doesn’t matter if you can’t finish it today and tomorrow.
What I want is that in the last three to five days, these thirty workers have work to do without new tasks.”
Sister Jiang smiled and said, "Mr. Song, if you do this, you will be a bit idle.
It's not like your style."
Song Xiaoshan smiled and said, "As the situation is forced, you can do your work with peace of mind, don't spread it."
If my morning meeting is smooth, maybe there will be new plants tomorrow.
In that case, your current thirty workers are not enough, so you have to discuss with the greening engineer Wang Bin how many working days it takes to complete the work-rush task this time.
If more greening workers are needed at any time, they can arrange so many workers at any time."