Chapter 444 Gross Profit Margin of Seedlings Purchasing
After Song Xiaoshan finished speaking, he looked at everyone and said, "It is useless to talk too much about the great principles. If you don't talk about them, it is not conducive to the unity of thought.
OK, don't say much nonsense.
I began to discuss how to complete the construction task of Bowan Phase I landscape improvement before the Lunar New Year.
For the time being, according to the professionalism, the parallel departments involved will be appropriately interrupted and supplemented.
Park construction engineer Zhao Dajin, please tell me about the arrangements for park construction.”
Park construction engineer Zhao Dajin said: "I don't have much to do with park construction.
Just lay some white sand to repair the hard landscape of the entire park.
Build an ecological railing of several hundred meters."
Song Xiaoshan: "Who needs cooperation needs to be said."
Park construction engineer Zhao Dajin: "We need to buy back Baisha."
Jin Haoran replied: "Baisha has purchased it and will arrive tomorrow."
Zhao Dajin, a garden construction engineer, said: "I'll inform me when I arrive and arrange a few small workers and the laying will be done in one day."
"Okay, I sent the driver's phone number to your mobile phone text message. I asked the driver to contact you directly to arrange unloading the truck."
"Okay, Baisha's matter is ready.
I can complete the variety and specifications of the materials required for hard landscape repair in the entire park today and will be provided tonight.”
Song Xiaoshan arranged: "Dajin, the varieties and specifications of the materials required for the maintenance of hard landscape in your park are released. Make a material delivery note, and then sign it with the metal worker and I, and then hand it over to the materials manager Wang Ming to purchase. Remember to write down the arrival time requirements.
Try to advance in time.”
Park construction engineer Zhao Dajin: "Okay.
Is the team sure about the ecological railing?”
Song Xiaoshan: "The team has not been decided yet. Wang Ming, how do you deal with this ecological railing?"
Wang Ming, material procurement: "Mr. Song, I don't know what I have now, it's a bit difficult to implement.
At present, I don’t know how long, how tall, and what material is made of this ecological railing, which means I don’t know what kind of manufacturer to discuss.”
Song Xiaoshan replied: "Mr. Wang, you are right.
It is precisely because of this that we need to concentrate people from all majors in this conference room for meetings and discuss them to confirm these issues.
Because there are no construction drawings, we will discuss an implementation method. In the future, the design institute will draw design drawings based on how we construct.
We ask the resident art director to answer your question to the beauty Qi Da.”
The resident art director Xiang Qi replied: "The art requirements I put forward in this railing are first of all, in line with the requirements of ecological and environmental protection.
Then the height is greater than 1.2 meters, and it must have good light transmission. It cannot affect the guests' viewing of the lake once the railing is built."
Wang Ming, a material procurement company, replied: "Then I will find several types of manufacturers to provide you with some pictures, okay?"
Xiang Qi, the resident art director, replied: "Yes."
"How long does it take to rail, Mr. Zhao."
"I pulled it with a tape ruler on the spot and it requires a 565-meter-long ecological railing."
Song Xiaoshan praised: "Okay, if you do this, will you finish Zhao Dajin's affairs in the garden be discussed?"
"Yes, my matter has been finished. Mr. Song."
"Then you can leave the conference room now and deal with your material bill of withdrawal."
"Okay, I'll go to the scene to take a closer look now."
Song Xiaoshan arranged for greening engineer Wang Bin: "Mr. Wang? Your greening output value accounts for the most in this increase. You can tell me what you need to cooperate with."
Greening engineer Wang Bin said with a smile: "Mr. Song, although my output value accounts for a large proportion, things are relatively simple.
Since there are no construction drawings? So where to plant what and how much to plant? How to plant, I need the on-site art director to come to the scene to give guidance to the beauty of Qi Da.
It is also because there is no construction drawing? So I can’t get the material delivery note for the seedlings? Let’s see if the resident art director asked the beauty Qi Da to provide a material delivery note for Yu Shengjie to purchase.
I'll have no other requirements.
I can also express my opinion here, please rest assured by the leader.
Just tell me how many seedlings will come one day in advance? How much will I plant as much as I come? The survival rate will not be low."
Song Xiaoshan affirmed: "I like Wang Bin's statement? I have added confidence in successfully completing this project.
Please ask the resident art director to answer the questions of greening engineer Wang Bin to the beauty of Qida.”
The resident art director Xiang Qi replied: "I can't handle the bill of materials alone."
What I can determine is where to plant what varieties, and as for the specifications, it still needs to be provided by seedlings Yu Shengjie."
Seedling Procurement Yu Shengjie replied: "I have the specifications, but I don't know whether I dare to fall."
Zhang Yunqing arranged: "Metalworking? Before this meeting, arrange the gross profit margin table of the Bowan Phase I project you sorted out? Have you printed it?"
Jin Haoran raised the printing paper in his hand and said, "Mr. Zhang, I have printed a few copies."
Zhang Yunqing: "Okay, now I will give Yu Shengjie one in order, give me one, give Mr. Song one, and give Xiang Qi, the art director."
Jin Haoran distributed the gross profit margin table of the Bowan Phase I project according to Zhang Yunqing's requirements and said, "Okay? I happened to give it to you, I still have one in my hand."
Zhang Yunqing said: "Please take a look at the gross profit margin table in your hand.
My opinion is to first choose the varieties that have a price and have a gross profit margin of more than 50%. It is recommended not to choose negative gross profit margins, and try to choose as few as possible for low gross profit margins.
In this way, Yu Gong and the resident art director Xiang Damei can follow this principle to confirm the selected variety specifications. As for the quantity corresponding to each variety specification, the greening engineer and the art director need to go to the site to check and confirm after careful calculation.
Also, Yu Shengjie can buy seedlings, and you can also find the suppliers of high-quality seedlings in your hands to learn about the current supply of seedlings on the market.
This will prevent the seedling material delivery order that has been negotiated and cannot be implemented."
Yu Shengjie replied: "This matter will take a lot of time. After I will clarify the seedling source of seedling suppliers, I will provide a list of suggestions for the art director Xiang Qi, who will choose."
Zhang Yunqing replied: "Yes, when the material list for your seedlings is settled, you must keep in touch with Metalworkers at any time and let him calculate the gross profit margin."
Jin Haoran asked: "Mr. Zhang, where should we control the gross profit margin of this seedling?"
Zhang Yunqing replied: "Seedlings have the problem of death and replanting, so we need to take these factors into consideration. I hope that the gross profit margin of this seedling can be obtained by optimizing the plan to achieve a surface theoretical gross profit margin of more than 50%.