Chapter 476 The key point of life and death

Zhao Manfu, Zhang Yunqing, and Song Xiaoshan continued to check the site of the Bowan Phase I project landscape improvement project.

Zhao Manfu asked: "The highlight of your project is mainly placed on the seven seven-star-shaped osmanthus flowers (dangui) I just saw?"

Song Xiaoshanhui reported: "Mr. Zhao, I discussed with Party A, Liu Yuze and our resident art director to Qi that the leader of Party A will come to inspect the project on site in the past few days, and it will be done in a few days.

And if you see the effect, you will be considered as the seven-star-shaped osmanthus (spicy osmanthus).

At the same time, our spherical osmanthus is also a highlight, but unfortunately, what we know now is that only a hundred plants have been implemented.

If this spherical osmanthus needs to be effective, the amount of the spherical osmanthus needs to be large, and the total demand has reached 300 plants, which can form an effect of scale. At first glance, it will produce a feeling of inner shock.

I have no idea whether this spherical osmanthus can be planted before the arrival of Party A's leaders, and we have planted it well to form a good artistic effect. Now I have no idea.”

Zhao Manfu asked: "To put it bluntly, it is the supply data of this spherical osmanthus. You don't know whether it is ready or not, right?"

"That's what Mr. Zhao."

"I have specially transferred the seedlings to you. You can't solve this problem. Isn't it a bit inappropriate?

Have you ever told Yu Shengjie about the reasons why you have to be so anxious and have you been so anxious? Have you emphasized it?"

"No."

"Then you are a problem with the working method. You are just in a hurry and know the reason for the hurry.

Others who do specific things only know that you are anxious, but not the reason for the urgent matter. Perhaps their work efforts are not sufficient.

You are the only one who is left to worry about it.

This will not solve the problem."

“Mr. Zhao’s criticism was correct.

I'll think of a way to solve this problem."

"What else can I think of?

The best way now is to find Yu Shengjie, tell him the reason for your urgent need, and ask him to do whatever it takes to ensure that all 300 spherical osmanthus plants will be supplied to the project department's site tomorrow and the day after tomorrow.

When doing things, you must be generous, have a pattern, have courage, and strictly distinguish between priorities."

Song Xiaoshan was stunned by the lesson, and his forehead was covered with fine beads of sweat unconsciously. He reached out to wipe it, and the beads of sweat came out again in a bad mood.

Zhao Manfu stared at Song Xiaoshan with his eyes not very friendly, and Song Xiaoshan's expression seemed to be out of shape.

Zhang Yunqing next to him walked to Song Xiaoshan and whispered: "Call Yu Shengjie to urge him to do it."

Song Xiaoshan nodded, took out his cell phone, found Yu Shengjie's phone number in the address book, and called and asked: "Mr. Yu, today's seven-star-shaped osmanthus (dangui) has arrived.

After Xiang Qi's command, the effect was very good.

How many of the 300 spherical osmanthus plants have been determined now?”

"The first day, 20 plants were raised, and the second one was raised.

There are still 230 plants that have not been implemented."

"Oh, that's too much."

"There is nothing to do. Boss Cao Shenggen and I have been working hard to get the supply of goods outside these days."

"Well. I know you've worked hard."

"Not hard work, this is our job, we should do."

"You need to work harder and work harder. You must ensure that the remaining 270 spherical osmanthus with a breast diameter of 15cm will be purchased on site for planting in the time frame tomorrow and the day after tomorrow."

"Mr. Song, according to the first three days, the rate of resolving the seedlings supply of 70 plants was achieved, which is equivalent to solving 23 plants every day. At this rate, it takes 12 days to supply all spherical osmanthus.

This fully meets your construction period requirements.

Why do we have to compress it to tomorrow and the day after tomorrow to complete it in the next two days?

This is too embarrassing."

“Mr. Yu, you don’t know anything.

Party A's senior leaders from Kyoto will go to this construction site in four or five days to check the project situation, but the specific time has not been completely determined.

Party A's Liu Yuze and Su Xiashan both want to compete for some face in front of their leaders. Now in such a short time, only spherical osmanthus and seven seven-star osmanthus (poly osmanthus) can be achieved through hard work.

If we control the planting of 300 spherical osmanthus plants within the time frame of the day after tomorrow and the day after tomorrow, with Party A Liu Yuze's understanding of Party A's leaders, our project will be able to fully demonstrate to us.

Satisfied artistic effect.

You know that this satisfaction can be equivalent to a key point in life and death for my project department.

The leader of Party A is satisfied with the artistic effect, and the project department will live a good life and be very comfortable.

The leader of Party A is dissatisfied with the artistic effect, and the project department may be cleared out and the company is required to replace people again to solve the problem.

Don’t forget, I am already the first project manager of this project department, and my current project manager has added a substitute word to the later, which is temporary.

When the company sent me to this project department, I said that if I did it well, I became a formal project manager and a director-level project manager. If I couldn’t do it well, I would let me get out.

Having said so much, do you now know why I have to arrange for you to solve the supply of spherical osmanthus flowers in such a hurry?"

"I understand, Mr. Song."

"I just know, it won't work."

“Is there a viable solution?”

"Let's do this, I turned out to be Miaoyuan who went to run with Cao Shenggen.

After hanging up the phone a while, I went to Miaoyuan separately from Cao Shenggen.

In this way, you will definitely save more time.

I expect to be able to reply to you two hours later.”

Zhao Manfu signaled to Song Xiaoshan that he had something to say to Yu Shengjie.

Song Xiaoshan said to the phone: "Don't hang up the phone, Mr. Zhao is going to find you."

After receiving the phone, Zhao Manfu said domineeringly: "Yu Shengjie, have you explained Song Xiaoshan's mission just now?"

"Mr. Zhao, I have made it clear. Mr. Song asked me to know that the day after tomorrow, 300 spherical osmanthus flowers must be purchased."

"Have you explained the reason for such an urgent arrangement?"

"Explained clearly."

"This is a task that must be completed, and this is a critical time node for the survival of the Bowan Phase I project department.

This task must be completed, there is no reason or excuse to tell, and there is no way out.

If there is difficulty in achieving the task, please contact Song Xiaoshan and me in time. In my heart, in order to win this beautiful turnaround, if it can be achieved just by spending more money, as long as it is not too excessive, I

All are acceptable.

Do you understand?"

"Understand, please ensure that you complete the task, Mr. Zhao."


This chapter has been completed!
Previous Bookshelf directory Bookmark Next